23.03.2013 Views

Brochure (binnenwerk) 'General Terms and ... - Port of Rotterdam

Brochure (binnenwerk) 'General Terms and ... - Port of Rotterdam

Brochure (binnenwerk) 'General Terms and ... - Port of Rotterdam

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HARBOUR TOWAGE KOTUG<br />

ROTTERDAM/EUROPOORT FROM THE RIVER TO OR FROM<br />

1 <strong>Rotterdam</strong>: <strong>Rotterdam</strong>, Schiedam, Vlaardingen <strong>and</strong> Botlek area.<br />

2 Europoort: assistance from fairplay (inside pierheads) to Europoort berth <strong>and</strong> back.<br />

L.o.a. <strong>of</strong> vessels in meters (a)<br />

up to -<br />

139 -<br />

151 -<br />

164 -<br />

176 -<br />

188 -<br />

213 -<br />

237 -<br />

261 -<br />

286 -<br />

310 -<br />

335 -<br />

359 -<br />

138<br />

150<br />

163<br />

175<br />

187<br />

212<br />

236<br />

260<br />

285<br />

309<br />

334<br />

358<br />

383<br />

(a) Length according to Lloyd’s Register.<br />

MISCELLANEOUS RATES AND SURCHARGES<br />

prices in euro’s<br />

1 Keeping going, extra pushing to berth (in connection with an assistance): 550 per hour<br />

2 Waiting (first half hour free <strong>and</strong> minimal one half hour): 450 per hour<br />

For shifting <strong>of</strong> ships within the <strong>Rotterdam</strong> or Europoort area 35% surcharge on the respective area rate is applicable.<br />

For shifting from the <strong>Rotterdam</strong> area to the Europoort area or v.v., special arrangements have to be made.<br />

3 25% surcharge on holidays <strong>of</strong>ficially recognized in the port <strong>of</strong> <strong>Rotterdam</strong> from 17:00 o’clock the day before<br />

till 07:00 o’clock the day after such holiday.<br />

4 Assistance <strong>of</strong> dead ships 50% surcharge on all rates (waiting, surcharges for holiday work <strong>and</strong> fog excluded).<br />

5 Cancellation: If arrival, departure or shifting is cancelled or postponed without notice being given at least one hour<br />

before the services are due to commence <strong>and</strong>/or tug(s) is (are) dismissed without being used: half <strong>of</strong> the tariff will<br />

be charged.<br />

6 In case <strong>of</strong> a visibility <strong>of</strong> less than 500 meters an additional charge <strong>of</strong> 50% for assistance during fog will be applicable<br />

on all rates (waiting <strong>and</strong> holiday surcharge excluded).<br />

1<br />

975<br />

1,120<br />

1,260<br />

1,390<br />

1,520<br />

1,730<br />

1,970<br />

2,300<br />

2,690<br />

3,420<br />

3,650<br />

3,860<br />

4,100<br />

• For assistance outside above mentioned areas, special arrangements have to be made.<br />

• All rates published in this tariff (fog <strong>and</strong> holiday surcharges excluded) are subject to prevailing bunker surcharge.<br />

• The above rates will not apply in case <strong>of</strong> drift-ice, vessels broken loose from their moorings <strong>and</strong> other unforeseen circumstances.<br />

• Rates: per tug.<br />

• Payment within 30 days.<br />

• Discounts available for long term contracts.<br />

• No surcharges for weekends, night work <strong>and</strong> use <strong>of</strong> tug’s hawsers.<br />

2<br />

1,140<br />

1,280<br />

1,440<br />

1,630<br />

1,820<br />

2,160<br />

2,520<br />

2,840<br />

3,150<br />

3,420<br />

3,650<br />

3,860<br />

4,100<br />

TARIFFS OF THIRD PARTIES 2012 35

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!