High Speed Rail - Center for Neighborhood Technology
High Speed Rail - Center for Neighborhood Technology
High Speed Rail - Center for Neighborhood Technology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>High</strong> <strong>Speed</strong> <strong>Rail</strong> and Greenhouse Gas Emissions – CCAP & CNT<br />
Appendix D<br />
U.S. Department of Transportation, Bureau of Transportation Statistics. “National Household Travel Survey 2001.”<br />
http://www.bts.gov/programs/national_household_travel_survey/<br />
U.S. Department of Transportation, Federal <strong>Rail</strong>road Administration. “<strong>High</strong> <strong>Speed</strong> Ground Transportation.”<br />
http://www.fra.dot.gov/us/content/31<br />
U.S. General Accounting Office. “Intercity Passenger <strong>Rail</strong>: Assessing the Benefits of Increased Federal Funding <strong>for</strong><br />
Amtrak and <strong>High</strong> <strong>Speed</strong> Passenger <strong>Rail</strong> Systems.” Testimony be<strong>for</strong>e the Subcommittee on Transportation,<br />
Committee on Appropriations, House of Representatives. March 2001. http://www.gao.gov/new.items/d01480t.pdf;<br />
U.S. General Accounting Office. “Northeast <strong>Rail</strong> Corridor: In<strong>for</strong>mation on Users, Funding Sources, and<br />
Expenditures.” June 1996. http://ntl.bts.gov/lib/8000/8500/8565/rc96144.pdf<br />
U.S. House of Representatives, Transportation Committee, Subcommittee on <strong>Rail</strong>roads. “Hearing on Getting Acela<br />
Back On Track.” May 11, 2005. http://www.house.gov/transportation/rail/05-11-05/05-11-05memo.html<br />
Vermont Agency of Transportation, et. al. “Boston to Montreal <strong>High</strong>-<strong>Speed</strong> <strong>Rail</strong> Planning and Feasibility Study,<br />
Phase I, Final Report.” Prepared by Parsons Brinkerhoff Quade and Douglas, et. al. April 2003.<br />
http://www.bostonmontrealhsr.org/documents/Final_Repor_%20Boston-Montreal_HSR-Phase1.pdf<br />
Virginia Department of <strong>Rail</strong> and Public Transportation. “Richmond to South Hampton Roads <strong>High</strong>-<strong>Speed</strong> <strong>Rail</strong><br />
Feasibility Study: Task 3 - Ridership And Revenue.” by AECOM Consulting Transportation Group, Inc. and<br />
Parsons Transportation Group. May 2002. http://www.drpt.virginia.gov/downloads/files/shrridership.pdf<br />
Washington State Department of Transportation and Morrison Knudsen Corporation. “Options <strong>for</strong> Passenger <strong>Rail</strong> in<br />
the Pacific Northwest <strong>Rail</strong> Corridor.” 1995. http://www.wsdot.wa.gov/rail/plans/library/ropt_all.pdf<br />
Washington State Department of Transportation. “Amtrak Cascades Plan <strong>for</strong> Washington State 1998-2018 Update.”<br />
April 2000. Accessed from http://www.wsdot.wa.gov/rail/plans/pdf/Final11-17planall.pdf<br />
Washington State Department of Transportation. “Pacific Northwest <strong>Rail</strong> Corridor: Revised Intercity Passenger <strong>Rail</strong><br />
Plan <strong>for</strong> Washington State 1998-2018.” by The Resource Group and HDR Engineering, Inc. December 1998.<br />
http://ntl.bts.gov/data/pacnwrail3.pdf<br />
D-3