24.03.2013 Views

road verges on rural roads - NERC Open Research Archive ...

road verges on rural roads - NERC Open Research Archive ...

road verges on rural roads - NERC Open Research Archive ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

UNCISHIRE<br />

Varied topography. No<br />

overall policy except to<br />

niniaise expenditure.<br />

LEICESTERSHIRE<br />

County instructi<strong>on</strong>s<br />

based <strong>on</strong> Marshall<br />

Collittsa rec-endati<strong>on</strong>a.<br />

LINCOLN - KESTEVEN<br />

TRUNX PRINCIPAL CUSS I1 CUSS 111 UNCUSSIFlEO<br />

2 cuta. start in June.<br />

4 cuts or ae required to keep the first srath down to 6 ins.<br />

in height from Hay to September. Remainder of verge I or 2<br />

cuts, in Way and in e utm to keep vegetati<strong>on</strong> to 12 ins.<br />

A. AI(T) 5 cutr, =re., between ~prii and octobar.<br />

B. Others, 3 euts, late April/May, June and autunn, <strong>on</strong>e<br />

swath. Remainder of verge no management until necessary<br />

and may& n<strong>on</strong>e et a11 in am siren seas<strong>on</strong>.<br />

-- ~ --<br />

1 cut except for role very minor <str<strong>on</strong>g>road</str<strong>on</strong>g>s here there -y be no cutting in any given<br />

cutting is mainly for reed c<strong>on</strong>trol and nuat be d<strong>on</strong>e by 1st of *"gust. start late<br />

as possible to save m<strong>on</strong>ey, but actual date may depend <strong>on</strong> tho state the vegetati<strong>on</strong> was left<br />

in at the end of the previous year. Special probles exist in the ~ & e District.<br />

2 cuts or first swath in Hay and in aut- to keep height dom to 12 ins. Reaainder L cut,<br />

In awtm, after dispersal of eeed or wild plants. cuttings and embmkmentr generally kept<br />

to 12 ins. In general prmitted marim- height of vegetati<strong>on</strong> related to traffic density<br />

the <str<strong>on</strong>g>road</str<strong>on</strong>g>.<br />

2 cuts, of <strong>on</strong>e swath, beginning after the more immrtant <str<strong>on</strong>g>road</str<strong>on</strong>g>s have had their first cut,<br />

usually end of Mey or into June and sec<strong>on</strong>d in the autu<strong>on</strong>. ~ack vergea nothing until something<br />

is necessary.<br />

sT*rTURDSHlRE Spray plus 2 or 3 cuts. Hay apply additi<strong>on</strong>al spray in the 2 cuts, in early summer of <strong>on</strong>e srath, and whole verge later in septeber. "ill if<br />

~hird the whole verge, but sprays and other thought appropriate.<br />

of 6-8 ft. "idth. sprays have been used for 10 years<br />

OF more.<br />

S U P m - EAST 3 CY~S, starting in ~ ~ -d ~ ending i l in September. First 3 cuts if possible, with last cut of *Is verge. If a mole width cut not possible in any<br />

two of <strong>on</strong>e swath, final cut of whole verge. On dual<br />

carriageray ro- keep vegetati<strong>on</strong> to 4-6 i ~ .<br />

<strong>on</strong>e year <strong>on</strong> a particular <str<strong>on</strong>g>road</str<strong>on</strong>g>, then it will get priority for cutting whole riath tha "ext<br />

Y-.<br />

SUSSEX - EAST 3 cute. First in may of <strong>on</strong>e swath, sec<strong>on</strong>d in July of whole<br />

verge md third in September of <strong>on</strong>e swath. *ale verge cut<br />

Following the flrrt cut of major mads cut other r-da =ither 4 full width, or b) <strong>on</strong>e<br />

<strong>on</strong>ly. As cycle c<strong>on</strong>tinues, vergea may get UP to 3 cuts but those that were <strong>on</strong>ly cut <strong>on</strong>e<br />

in ~ uly as machinee have difficulty with dense vegetati<strong>on</strong><br />

later in the year.<br />

swath early <strong>on</strong>, will not have back verge= cut unless there is a serious complaint about<br />

weeds, untidiness, etc. Decisi<strong>on</strong> to cut whola verge or <strong>on</strong>ly <strong>on</strong>e swath made <strong>on</strong> ~ i~hxay<br />

safety and engineering criteria <strong>on</strong>ly.<br />

w*WlCKSHIRE A. Spray 16 milea selected by-pasees and central reservati<strong>on</strong>s 2 or 3 cuts. If <strong>on</strong>ly tm cuts, the recd rill be of whole verge in the aut- rather than<br />

~ ~ ~ d foi- ~ ~ with ~ m/240 r in ~ r and again ~ in ~une to obviate cutting. during the aumer.<br />

lowing work study<br />

Began in 1968 with spraying of areas difficult/dangerous of<br />

investigati<strong>on</strong>s. policy aceesa but have extended applicati<strong>on</strong>s to adjoining areas as<br />

under dias"..l<strong>on</strong> With<br />

view to possible changes.<br />

the opportunity arose.<br />

8. 3 cuts of raining mileage, first in ~ay/June of <strong>on</strong>e<br />

swath, of "hole verge in JU~Y/AUSUS~ and third to<br />

tidy-up in the sutuol.<br />

WRCESTERSHIRE A. spray 15% of ~ith m/240 late ~ ~ivbagiming of z cuts of <strong>on</strong>e era% 6s- <str<strong>on</strong>g>verges</str<strong>on</strong>g> gerrraily left uncut.<br />

Hay, Plus a cut later if required.<br />

~ ~<br />

8. 2 or 3 cuts ~t-ting in May of n 6 it. swath.<br />

verge* cut in the autunn.<br />

Baok<br />

YOPKSHIRE - E. RIDING 2 cuts. first in m v of <strong>on</strong>e srath. sec<strong>on</strong>d of whole verge in 2 cuts <strong>on</strong> priority basis efter principal <str<strong>on</strong>g>road</str<strong>on</strong>g>s, first cut of <strong>on</strong>e swath. aw<strong>on</strong>d of *hole<br />

YOKSHIRE - N. RIDING<br />

Based <strong>on</strong> MOT Technical<br />

m a T5/68, DoE rmo H4/71<br />

and reemdeti<strong>on</strong>s of the<br />

HnrSha11 Camittee.<br />

Headquartere c<strong>on</strong>trol.<br />

ERECDtSHIRB<br />

~iriai<strong>on</strong>al Surveyors have<br />

ride discreti<strong>on</strong>.<br />

August, cute With the "+,ole verge cut in .id-a-er and<br />

<strong>on</strong>e Math otherrise.<br />

1 cut of ordinary vergsa of dual carriagwaya, central<br />

reserves and erne of the wider <str<strong>on</strong>g>verges</str<strong>on</strong>g> of <strong>rural</strong> principal<br />

<str<strong>on</strong>g>road</str<strong>on</strong>g>s. otherwise fr<strong>on</strong>t "erge to 6 ins. in height<br />

and back verge to 12 ins. by cutting as required. om<br />

moorland <str<strong>on</strong>g>road</str<strong>on</strong>g>s <strong>on</strong>ly <strong>on</strong>e math aaintsined and this to be<br />

kept to 12 ins. in height.<br />

a. spray about 150 milea of verge MH/z~D in spring and<br />

again later if required.<br />

8. I cuts, whole verge in early-mid nay, ~uly and aut-.<br />

verge. Some m y not get the sec<strong>on</strong>d cut in a particular year and so will get priority in<br />

the next year. Scrub rill be allowed to develop up to 5 it. fra the carriageray. %me<br />

very minor <str<strong>on</strong>g>road</str<strong>on</strong>g>a .ay not get their rerges cut at all in a particular year.<br />

maintain to matiam or 12 ins. in height generally by 2 cuts, first of <strong>on</strong>e swath in M..Y/Ju~~<br />

end sec<strong>on</strong>d of "hole verge in August. Moorlend roeas <strong>on</strong>e swath <strong>on</strong>ly, 2 outs to c<strong>on</strong>trol weeds.<br />

mere practicable 1-3 cuts per year, normtlly whole of flat areas. Dates or cutting<br />

depending <strong>on</strong> availability of machines and to some ~xtent <strong>on</strong> requiremanta of nesting birds,<br />

flowering plants etc. mite large areas of steep banks, cm<strong>on</strong> land etc. "here no lunage-<br />

lent is carriee ~ut.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!