1 INTRODUCTION<br />

This report presents the results of a desk-based study and targeted peat depth<br />

survey conducted at the Clocaenog Forest Wind Farm site in Denbighshire<br />

and Conwy, North Wales. The study was undertaken to determine the extent<br />

of peat deposits in the vicinity of the proposed wind farm infrastructure, both<br />

to inform amendments to the site layout during the design stage, and to<br />

identify areas where mitigation measures are required to protect peatland<br />

habitats during construction and operation of the wind farm.<br />

The specific objectives of the peat assessment were to:<br />

• review existing information sources to identify potential areas of peat<br />

deposits across the site;<br />

• undertake a targeted peat survey of the site to ‘ground truth’ the existing<br />

sources of information and identify the extent of peat deposits in<br />

proximity to wind farm infrastructure;<br />

• inform amendments to the wind farm site layout to avoid impacting on<br />

peat deposits where possible;<br />

• calculate the approximate area and volume of peat that will be directly<br />

and indirectly impacted by the proposed scheme; and<br />

• identify areas where mitigation measures are required to prevent or<br />

reduce impacts to identified peat deposits.<br />

The remainder of this report is structured as follows.<br />

• Section 2 outlines the assessment methodology and the consultation<br />

undertaken to date with Countryside Council for Wales (CCW).<br />

• Section 3 presents the results of the desk-based study and field survey, and<br />

the calculations of direct and indirect peat loss as a result of wind farm<br />

construction.<br />

• Section 4 identifies the re<strong>com</strong>mended mitigation measures to prevent and<br />

reduce impacts to the identified peat deposits.<br />

• Section 5 presents a summary of the results.<br />

ENVIRONMENTAL RESOURCES MANAGEMENT <strong>RWE</strong> NPOWER RENEWABLES LTD<br />

1