PÖYRY PROJECT SUMMARY<br />

Project Description<br />

Consulting services for the safety evaluation of existing<br />

recharge dams<br />

Sultanate of <strong>Oman</strong><br />

The Ministry of Regional<br />

Municipalities, Environment and<br />

Water Resources (MRMEWR)<br />

required safety evaluations of seven<br />

existing recharge dams built between<br />

1985 and 1992 in the Sultanate of<br />

<strong>Oman</strong>. The objective of the study was<br />

to evaluate the condition of each of<br />

the dams and to assess their compliance<br />

with public safety requirements.<br />

The <strong>Safety</strong> Evaluation of Existing<br />

<strong>Dam</strong>s (SEED) procedure was used to<br />

determine the condition of each dam<br />

with respect to its structural and<br />

operating integrity. This procedure<br />

identifies any existing or potential<br />

safety deficiencies and confirms them<br />

by analyzing existing or developed<br />

data.<br />

Any engineering and geological<br />

deficiencies identified from the site<br />

inspection and/or from other sources<br />

are entered into a database and<br />

classed according to their degree of<br />

seriousness. The measures analysed<br />

covered the full range of issues that<br />

normally apply to dams and included,<br />

typically, hydrology and sedimentation,<br />

hydraulics, seismo-tectonic risk,<br />

geological, geotechnical and<br />

structural issues, as well as the<br />

required monitoring and maintenance<br />

works. The analyses were made using<br />

state-of-the-art techniques and<br />

methods available amongst all<br />

relevant disciplines, and were carried<br />

out in the following two phases:<br />

Client<br />

Ministry of Regional Municipalities,<br />

Environment and Water Resources<br />

(MRMEWR), Sultanate of <strong>Oman</strong><br />

Project<br />

Evaluation of the present condition of<br />

seven existing flood protection and<br />

ground water recharge dams.<br />

Services<br />

� Detailed inspection of the dams to<br />

determine their present condition<br />

� Review and analysis of geology,<br />

hydrology and hydraulic data<br />

� Tendering of sub-contracts for in<br />

situ and laboratory testing<br />

� Supervision of site investigation<br />

works and laboratory testing<br />

� Structural (stability) analyses<br />

� Definition of remedial works<br />

� Cost-benefit analysis of proposed<br />

remedial measures<br />

Execution Period<br />

2005 – 2007<br />

Phase 1 (inspection and examination)<br />

was a technical assessment based on<br />

all available data from site inspections<br />

and reports on the dams. If the results<br />

of this phase were inconclusive, a<br />

Phase 2 study (investigation and<br />

analysis) was required. This was a<br />

more detailed study and included the<br />

special field investigations and<br />

laboratory tests needed to establish<br />

the necessary design parameters for<br />

the more sophisticated analyses of<br />

the dams and their related structures.


Depth [m]<br />

Sultanate of <strong>Oman</strong>: consulting services for safety evaluation of existing recharge dams,<br />

Key data<br />

Name of dam<br />

0.00<br />

0.20<br />

0.40<br />

0.60<br />

0.80<br />

1.00<br />

1.20<br />

1.40<br />

1.60<br />

1.80<br />

2.00<br />

Gypsum vs. Depth<br />

Gypsum content [%]<br />

0 5 10 15 20 25 30<br />

TR-1<br />

5<br />

2<br />

TR-2<br />

7<br />

Type of<br />

structure<br />

5<br />

2 D2<br />

7<br />

Completion<br />

year<br />

TR-2<br />

8 8<br />

Max. height<br />

of dam<br />

TR-1<br />

8<br />

TR-1<br />

Total length<br />

of dam<br />

Max. storage<br />

volume<br />

Capacity of<br />

spillway<br />

Wadi Al Jizi Zoned embankment 1989 20.40 m 1'234 m 0.66 Mm 3 7'800 m 3 /s<br />

Wadi Al Khoud Zoned embankment 1985 11.00 m 5'100 m 11.60 Mm 3 12'500 m 3 /s<br />

Wadi Fulaij (H) Zoned embankment 1992 7.70 m 3'346 m 3.70 Mm 3 2'200 m 3 /s<br />

Wadi Ghul Gabion cascade weir 1989 7.60 m 415 m 0.09 Mm 3 2'800 m 3 /s<br />

Wadi Khasab Zoned embankment 1986 23.00 m 830 m 16.00 Mm 3 1'000 m 3 /s<br />

Wadi Shariya Zoned embankment 1986 9.20 m 740 m 1.50 Mm 3 400 m 3 /s<br />

Wadi Mawa Zoned embankment 1986 8.00 m 820 m 1.40 Mm 3 350 m 3 /s<br />

<strong>Dam</strong>s covered by study with main characteristics.<br />

Seepage along downstream toe of the right wing embankment of<br />

Wadi Fulaij (Halban) dam following heavy rain and impounding in<br />

February 2006.<br />

Evaluation of laboratory tests: distribution of gypsum with depth (the numbers<br />

refer to the number of the trial pit or trench from which samples were obtained).<br />

In situ investigation works at Wadi Fualij (Halban) dam; drilling in<br />

reservoir area to locate possible seepage zones in gypsum.