28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Sl.N<br />

o<br />

ATHIMUGAM WATERSHED DETAILED PROJECT REPORT<br />

Format - 19<br />

Status of the Existing Water Bodies in the Watershed<br />

Type of Water<br />

body<br />

No.<br />

Owned by Status<br />

Water storage<br />

Capacity (mcft)<br />

Area<br />

designed to<br />

be benefited<br />

(Ha)<br />

1 Tanks 1 1 1 0.02 0.01 3.4 2.1 5<br />

2 Ooranies - - - - - - - - -<br />

- -<br />

3 Village Tanks 4 4 3 1 0.09 0.03 5.6<br />

3.2 19<br />

4 Farm Ponds - - - - - - - - -<br />

- -<br />

5 Sunkan Pond - - - - - - - - -<br />

- -<br />

6 Check dam - - - - - - - - -<br />

- -<br />

Total<br />

KRISHNAGIRI DISTRICT<br />

Source : PRA, Field Survey<br />

PWD<br />

Union<br />

Others<br />

Operating<br />

Defunct<br />

Originally<br />

designed<br />

5 5 2 0.11 0.04 9<br />

5.3 24<br />

Present<br />

Area<br />

actually<br />

benefited<br />

(Ha)<br />

No. of<br />

wells<br />

benefited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!