28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

39 282/2A Athimugam M.Venkatasamy Stone Wall 1 Ha 6000 1.640 9840.00 1.640<br />

40 292/1 Athimugam P.Pappanna Stone Wall 1 Ha 6000 1.760 10560.00 1.760<br />

41 292/2 Athimugam C.Pappanna Stone Wall 1 Ha 6000 2.830 16980.00 2.830<br />

42 294/1 Athimugam V.Basuvaraj Stone Wall 1 Ha 6000 1.770 10620.00 1.770<br />

43 294/2 Athimugam Venkatasamy Stone Wall 1 Ha 6000 1.595 9570.00 1.595<br />

44 297/1B,2 Athimugam P.Pappanna Stone Wall 1 Ha 6000 2.410 14460.00 2.410<br />

45 313/4 Athimugam V.Mariyappa Stone Wall 1 Ha 6000 1.550 9300.00 1.550<br />

46 314/3A,4,5 Athimugam M.Ashok Stone Wall 1 Ha 6000 1.910 11460.00 1.910<br />

47 322/1,2 Athimugam V.Thimmarayappa Stone Wall 1 Ha 6000 2.330 13980.00 2.330<br />

48 345/2 Athimugam Bedha Ramappa Stone Wall 1 Ha 6000 1.620 9720.00 1.620<br />

49 354/1 Athimugam Bedha Pudappa Stone Wall 1 Ha 6000 1.215 7290.00 1.215<br />

Sl.N<br />

o<br />

Total<br />

SF No Location Name of the User Group<br />

Water Harvesting Structure<br />

3.Farm Pond<br />

Proposed type of<br />

treatment<br />

93.880 563280.00 93.880<br />

Physical Financial<br />

1 63 Athimugam User Group Farm Pond 1No. 30000 1 30000<br />

2 53 Athimugam User Group Farm Pond 1No. 30000 1 30000<br />

3 110 Athimugam User Group Farm Pond 1No. 30000 1 30000<br />

4 218 Athimugam User Group Farm Pond 1No. 30000 1 30000<br />

Unit<br />

Unit<br />

cost<br />

(Rs.)<br />

Total<br />

Area<br />

likely to<br />

be<br />

benefited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!