28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.N<br />

o<br />

1<br />

55,54,21,241,239,52,<br />

59<br />

Physical Financial<br />

Athimugam User Group Major Check Dam 1 No 100000 8 800000.00 66.667<br />

2 97,99,104,132,241 Athimugam User Group Medium Check Dam 1 No 65000 5 325000.00 27.083<br />

3 247,245,239,236 Athimugam User Group Minor Check Dam 1 No 40000 6 240000.00 20.000<br />

4<br />

SF No Location Name of the User Group<br />

265,271,283,287,301,<br />

304<br />

Athimugam User Group<br />

7.Other Water Harvesting Structure<br />

Proposed type of<br />

treatment<br />

Loose Boulders<br />

Check Dam<br />

Area<br />

likely to<br />

be<br />

benefited<br />

1 No 6000 20 120000.00 10.000<br />

6 326,263 Athimugam User Group Cattle Pond 1 No 30000 2 60000.00 5.000<br />

7 226.33 Athimugam User Group<br />

Renovation of<br />

Existing Structure<br />

1 No 50000 2 100000.00 8.333<br />

TOTAL 43 1645000.00 137.083<br />

Unit<br />

Unit<br />

cost<br />

(Rs.)<br />

Total

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!