28.03.2013 Views

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

integrated watershed management programme – v - tawdeva

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Sl.N<br />

o<br />

SF No Location Name of the Farmer<br />

Format - 27<br />

Details of Renovated / Proposed Engineering Structures<br />

1.FIELD BUNDING<br />

Proposed type of<br />

treatment<br />

1 63/1A Athimugam Nanjundappa Field Bunding 1 Ha 3000 3.615 10845.00 3.615<br />

2 63/1B Athimugam Narayanakki Field Bunding 1 Ha 3000 3.610 10830.00 3.610<br />

3 64/4B Athimugam V.Mumieraj Field Bunding 1 Ha 3000 1.375 4125.00 1.375<br />

4 73/2 Athimugam N.Ramesh Field Bunding 1 Ha 3000 1.315 3945.00 1.315<br />

5 73/4A,4B Athimugam P.Sivappa Field Bunding 1 Ha 3000 0.600 1800.00 0.600<br />

6 73/1B,1C,1D Athimugam Thiagarajan Field Bunding 1 Ha 3000 0.490 1470.00 0.490<br />

7 85/1A Athimugam V.Munisamy Naidu Field Bunding 1 Ha 3000 1.160 3480.00 1.160<br />

8 85/1B Athimugam C.Nagammal Field Bunding 1 Ha 3000 1.115 3345.00 1.115<br />

9 85/2,3 Athimugam Kathirappa Field Bunding 1 Ha 3000 1.175 3525.00 1.175<br />

10 87/1 Athimugam Sundarachari Field Bunding 1 Ha 3000 0.720 2160.00 0.720<br />

11 87/2 Athimugam Muniyamma Field Bunding 1 Ha 3000 2.145 6435.00 2.145<br />

12 96/2A,2B1,2B2 Athimugam Muniyamma Field Bunding 1 Ha 3000 0.800 2400.00 0.800<br />

Unit<br />

Unit<br />

cost<br />

(Rs.)<br />

Total Area<br />

likely to<br />

Physical Financial<br />

be<br />

benefited

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!