03.04.2013 Views

MHD56209 Jib Cranes.pdf - ToolSmith

MHD56209 Jib Cranes.pdf - ToolSmith

MHD56209 Jib Cranes.pdf - ToolSmith

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

9. Tighten clamps at one end of cable.<br />

10. At opposite end of cable thread excess cable through clamps<br />

increasing tension until cable can support the weight of the<br />

trolleys and electrical cable.<br />

11. Tighten clamp (92).<br />

12. Connect electrical supply and test handling device.<br />

Testing<br />

Prior to initial use, all new, altered or repaired <strong>Jib</strong> <strong>Cranes</strong> shall be<br />

tested to ensure proper operation.<br />

1. Check <strong>Jib</strong> Crane movement through full operational range.<br />

Ensure movement is smooth and without binding. Ensure<br />

there are no obstructions through the operation range.<br />

2. Install lifting device to be used. Check position and power<br />

connections.<br />

3. Check operation of lifting device. Ensure lifting device<br />

responds correctly to control operation.<br />

20 <strong>MHD56209</strong> - Edition 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!