MHD56209 Jib Cranes.pdf - ToolSmith
MHD56209 Jib Cranes.pdf - ToolSmith
MHD56209 Jib Cranes.pdf - ToolSmith
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
9. Tighten clamps at one end of cable.<br />
10. At opposite end of cable thread excess cable through clamps<br />
increasing tension until cable can support the weight of the<br />
trolleys and electrical cable.<br />
11. Tighten clamp (92).<br />
12. Connect electrical supply and test handling device.<br />
Testing<br />
Prior to initial use, all new, altered or repaired <strong>Jib</strong> <strong>Cranes</strong> shall be<br />
tested to ensure proper operation.<br />
1. Check <strong>Jib</strong> Crane movement through full operational range.<br />
Ensure movement is smooth and without binding. Ensure<br />
there are no obstructions through the operation range.<br />
2. Install lifting device to be used. Check position and power<br />
connections.<br />
3. Check operation of lifting device. Ensure lifting device<br />
responds correctly to control operation.<br />
20 <strong>MHD56209</strong> - Edition 2