Propose to prepare all vessels at first drydock<strong>in</strong>g<br />
(from 2011) <strong>in</strong> order to obta<strong>in</strong><br />
flexibility <strong>in</strong> tim<strong>in</strong>g for <strong>in</strong>stallation<br />
Install pipe l<strong>in</strong>es, isolat<strong>in</strong>g valve(s),<br />
electric power breaker <strong>in</strong> ma<strong>in</strong> switch<br />
board o.a. <strong>in</strong> order to enable <strong>in</strong>stallation<br />
dur<strong>in</strong>g sea voyage<br />
Installation of ballast water treatment<br />
plant can then be planned between 2014<br />
– 2017 for the applicable vessels <strong>in</strong> the<br />
fleet<br />
We suggest to wait with yellow vessel<br />
unless it is considered beneficial out from<br />
a commercial po<strong>in</strong>t of view<br />
Frame-work agreement with respective<br />
selected suppliers<br />