05.04.2013 Views

BALLAST WATER TREATMENT system: Challenges in ...

BALLAST WATER TREATMENT system: Challenges in ...

BALLAST WATER TREATMENT system: Challenges in ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

KRISTIAN GERHARD JEBSEN<br />

SKIPSREDERI AS<br />

Evaluate <strong>system</strong>s and prepare for 2 pilot<br />

<strong>in</strong>stallations early 2011 prior to implementation of<br />

ballast water treatment <strong>system</strong>s for the KGJS<br />

managed fleet<br />

The pilot project aims to:<br />

Obta<strong>in</strong> experience for retrofit suitability and challenges<br />

Obta<strong>in</strong> operational experiences with respect to<br />

ma<strong>in</strong>tenance, reliability, follow up from makers<br />

Obta<strong>in</strong> BWT capacity experience<br />

Check quality on treated water<br />

FOLKE BERNADOTTES VEI 38<br />

5147 FYLLINGSDALEN,<br />

BERGEN, NORWAY

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!