Water Works Design and Supervision Enterprise<br />
1. INTRODUCTION<br />
1.1. OBJECTIVES AND STRUCTURE OF THE REPORT<br />
1.1.1 Objectives Of The Study<br />
The objectives of the <strong>Integrated</strong> <strong>Resource</strong>s Development Master Plan of <strong>Dire</strong> <strong>Dawa</strong><br />
<strong>Administrative</strong> <strong>Council</strong> as stated in the Terms of References are:<br />
• To prepare a Master Plan for an integrated development of the natural resources<br />
of the <strong>Dire</strong> <strong>Dawa</strong> <strong>Administrative</strong> <strong>Council</strong> for 30-50 years to come.<br />
• To prepare the <strong>Council</strong>’s’s natural, human and animal resources optimum<br />
utilization, with its best contributions to the DDAC economic development with<br />
minimum possible environmental impact.<br />
The study intends to identify different scenarios of development plans and select<br />
development plans that are justifiable and achievable or socially acceptable and<br />
economically viable.<br />
The master plan study is planned to be carried out in three phases i.e. Phase I:<br />
Reconnaissance, Phase II: Data Collection Survey and Analysis and Phase III: Master<br />
Pplan Preparation.<br />
The Reconnaissance Phase I was submitted in June 2002. The current report is Phase II:<br />
Data Collection, Survey and Analysis, which was commenced in September 2002.<br />
1.1.2 Phase II Activities and Reports<br />
The phase II activities are data collection and acquisition, site surveys and investigations,<br />
development of GIS and resource analysis. The outputs of the sectoral studies are<br />
presented in Section II of the Phase II reports, which is organized in five volumes. The<br />
maps are given in section III at a scale of 1:100 000 except hydrogeology map scale<br />
1:50000, which shall be updated to 1:50000 based on the comments to be given by the<br />
Steering Committee.<br />
The current main report contains Section I and describes the surveys carried out,<br />
development opportunities and constraints, planning issues, proposed sectoral<br />
development issues, initial development project ideas, and the program for the master<br />
plan phase.<br />
1.1.3 Objectives of the Main Report<br />
The main report objective is to show the development opportunities, constraints,<br />
problems, challenges and project ideas and strategies. In addition it describes the survey s<br />
that have been undertaken and draws the summary results of the sectoral studies.<br />
Phase II- Data Collection - Site Investigation Survey & Analysis – DDAC - Main Report<br />
1