10.04.2013 Views

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

RULES FOR PROVIDING FINANCIAL ASSISTANCE TO LATEX<br />

CENTRIFUGING FACTORIES UNDER PROCESSING, QUALITY<br />

UPGRADATION AND PRODUCT DIVERSIFICATION SCHEME 20<strong>02</strong>-07<br />

1. Title<br />

These rules shall be called the <strong>Rubber</strong> <strong>Board</strong>’s Rules for providing<br />

financial assistance to Latex Centrifuging Factories under Processing,<br />

Quality Up-gradation and Product Diversification Scheme, 20<strong>02</strong>-07.<br />

2. Objective<br />

The objective of the scheme is to provide financial assistance to Latex<br />

Centrifuging Factories in the country to improve quality, attain economy in<br />

cost of processing and modernize environmental protection systems.<br />

3. Eligibility<br />

All Centrifuge Latex Processors in the country, having centrifuging<br />

factories with valid processor’s licence issued by the <strong>Board</strong> and in<br />

existence as on 1.4.20<strong>02</strong> are eligible for this financial assistance. The<br />

processing factories in the estate sector which process small holder rubber<br />

in addition to estate crop will also be eligible for financial assistance under<br />

this scheme. The Latex Centrifuging Factories in the entire rubber growing<br />

areas in India except those in the NorthEastern Region will be eligible for<br />

financial assistance under this scheme.<br />

Page : 1


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

4. Activities<br />

The following activities are eligible for financial assistance.<br />

1. Modification/addition of tanks for desludging, bulking, including<br />

stirrers, lining with ceramic tiles etc.<br />

2. Procuring equipment for testing, quality control and implementation of<br />

ISO 9000/14000 certification systems.<br />

3. Improvements in packaging for field latex and latex concentrate.<br />

4. Procurement of computer and its accessories including software.<br />

5. Procurement of spare bowl and replacement of centrifuging machine for<br />

improving efficiency and productivity.<br />

6. Electronic weighing scales for packing of latex concentrate.<br />

7. Modification/addition to pollution control system to include biomass<br />

conversion and utilization to control air and water pollution.<br />

8. Sheds for storage of field latex/latex concentrate in barrels and roofing<br />

for storage tanks.<br />

9. Acoustic enclosures for diesel generators under environmental<br />

protection.<br />

10. Implementation of recommendations of the energy audit such as power<br />

factor improvement (on load and on no load), replacement of<br />

transformer, use of high efficiency motors, replacement/<br />

modification./overhauling of old diesel generating sets.<br />

Page : 2


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

5. Financial Assistance<br />

The financial assistance under this scheme will be as follows.<br />

1. RPS/Co-operative sector – 50% of the expenditure approved subject to a<br />

ceiling amount for each activity as in Annexure – 4. The total financial<br />

assistance to a processor in RPS/Co-operative sector will be further<br />

limited to Rs. 40 lakhs<br />

2. Private sector – 25% of the expenditure approved subject to a ceiling for<br />

each activity as in Annexure – 4. The total financial assistance to a<br />

processor in the private sector in the Tenth Five Year <strong>Plan</strong> Period<br />

(20<strong>02</strong>-07) will be further limited to Rs.20 lakhs.<br />

3. A 5% interest subsidy on loans availed from nationalised banks for<br />

implementing the scheme. The contribution of the processor has to be<br />

minimum 25% of the expenditure. The interest subsidy will not be<br />

available beyond 10 th Five Year <strong>Plan</strong> Period (i.e. from 1.4.2007). The<br />

total interest subsidy payable to a processor in the private sector during<br />

the Tenth Five Year <strong>Plan</strong> Period (20<strong>02</strong>-07) will be limited to 50% of the<br />

financial assistance eligible under 5.1 or 5.2 above as the case may be.<br />

Those beneficiaries who opt for financial assistance as per clause 5.1 or<br />

5.2 above will not be eligible for this interest subsidy.<br />

4. The ceiling amount of financial assistance for each activity is given in<br />

Annexure – 4.<br />

Page : 3


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

6. Terms and Conditions<br />

1. This scheme will be implemented during the 10 th Five Year <strong>Plan</strong> Period<br />

(i.e. 20<strong>02</strong>-07).<br />

2. The management committee of the processing factory proposing to avail<br />

the financial assistance under these rules shall authorize its Chief Executive<br />

to make an application (as per Annexure – 1) and shall pass a resolution (as<br />

per Annexure - 2) agreeing to abide by these rules and execute an<br />

agreement in the form appended to these rules as Annexure – 3.<br />

3. The processor applying for the financial assistance under the rules shall<br />

make an application in the prescribed form (Annexure 1). The application<br />

shall be supported by attested copies of the following documents:<br />

(i) Processor’s Licence<br />

(ii) Articles of Association of the Company/Society.<br />

(iii) Audited Financial Results of the factory for the past three years<br />

4. The applicant shall give a detailed proposal for the activities proposed<br />

along with the expected results along with recommendations of consultants<br />

engaged by the Processor. <strong>Board</strong> reserves the right to scrutinize the<br />

requirement /priority of the proposals of the applicant, and the financial<br />

assistance will be based on the decision of the <strong>Board</strong> on the above.<br />

5. Approval for financial assistance under the scheme shall be considered only<br />

if proper evidence with respect to the contribution of the share of finance by<br />

the applicant (50% in RPS and co-operative sectors and 75% in private<br />

sector) is made available.<br />

Page : 4


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

6. For availing the interest subsidy the processor shall take approval of the<br />

<strong>Board</strong> on the various terms and conditions of the credit before signing the<br />

loan agreement with the financial institutions. Payment of interest subsidy<br />

will be considered for loans availed from nationalised banks. Besides,<br />

payment of the interest shall be subject to the following conditions.<br />

1) The interest paid during Xth <strong>Plan</strong> period only is eligible for financial<br />

assistance.<br />

2) The interest subsidy will be released directly to the beneficiary.<br />

3) A certificate from the bank regarding the interest paid has to be<br />

produced with the application.<br />

4) Copy of the agreement with the bank, with amendments if any, should<br />

be produced with the application.<br />

5) The interest subsidy is applicable only for those loans availed for the<br />

procurement of machinery/equipment/works/service under the<br />

modernisation scheme.<br />

6) The interest subsidy shall be paid subject to production of an<br />

agreement by the applicant in the prescribed format<br />

7. If any subsidy is received from Central Govt / Organizations or any State<br />

Govt / Organizations for any of the items for which financial assistance is<br />

accepted from <strong>Rubber</strong> <strong>Board</strong> under this scheme, such subsidy amount in<br />

full will have to be remitted to <strong>Rubber</strong> <strong>Board</strong>.<br />

Page : 5


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

8. Preference will be given to those factories with BIS certification. Others<br />

may be considered on merit basis.<br />

9. Other things being equal, preference will have to be given for offers from<br />

BIS for ISO 9000 / 14000 Certification systems.<br />

10. The financial assistance will be released only after obtaining of the final<br />

statutory approvals from all the concerned authorities.<br />

11. On receipt of the approval by the <strong>Rubber</strong> <strong>Board</strong>, quotations shall be invited<br />

by the applicant for the supply of materials, machinery, works or other<br />

services. Such tender documents shall be prepared in consultation with the<br />

<strong>Rubber</strong> <strong>Board</strong>. The offers have to confirm to the guidelines given in<br />

Annexure – 5.<br />

12. <strong>Rubber</strong> <strong>Board</strong> will advise on placing orders / award of work after scrutiny<br />

of the offers.<br />

13. The applicant shall permit any officer of the <strong>Board</strong> authorized by the<br />

Chairman, <strong>Rubber</strong> <strong>Board</strong> to inspect the premises books of accounts,<br />

registers etc. of the processor. The processor shall also submit to the <strong>Board</strong><br />

reports/details the manner and time as prescribed by the <strong>Board</strong> from time<br />

to time.<br />

14. The applicant should undertake to carry out the instructions issued by the<br />

<strong>Rubber</strong> <strong>Board</strong> from time to time in all matters relating to technical aspects<br />

of processing.<br />

Page : 6


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

15. The applicant shall hypothecate the equipment/ machinery purchased and<br />

any building constructed / work done under this scheme to the <strong>Rubber</strong><br />

<strong>Board</strong> for a minimum period of 10 years.<br />

16. Notwithstanding the fulfillment of any or all of the conditions under these<br />

rules, the Chairman, <strong>Rubber</strong> <strong>Board</strong> has discretionary powers to grant or<br />

refuse the claim or to limit the assistance to a particular amount.<br />

17. The Chairman, <strong>Rubber</strong> <strong>Board</strong> will have the powers to alter / modify any of<br />

the provisions of these rules for the smooth operation of the scheme.<br />

18. The actual release of the amount shall only be made on compliance with all<br />

the formalities/conditions as stated above and on production of the<br />

following documents:<br />

a. Machinery – Quotation, evaluation statement, invoice, cash receipt,<br />

proof of delivery, installation etc.<br />

b. Details of cost of building / works with estimates, measurement and<br />

bills<br />

c. Installation of the machinery / equipment indicating basic price,<br />

installation charges, transportation, taxes etc.<br />

d. Entry of items in Stock Register/ Asset Register<br />

e. Performance certificate by the Authorized Engineer of the <strong>Rubber</strong><br />

<strong>Board</strong>.<br />

f. Interest Subsidy – Certificate from Financial Institution showing the<br />

details of interest paid during the relevant period.<br />

g. Reports/recommendations of the consultants engaged by the<br />

processor.<br />

Page : 7


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

7. No part of this document shall be reproduced in any form without the<br />

written consent of the undersigned. However this does not preclude<br />

the above person/processor from its free use for the implementation<br />

of objectives/purposes envisaged in the Scheme for Processing,<br />

Quality Upgradation and Product Diversification under the Tenth Five<br />

Year <strong>Plan</strong> : 20<strong>02</strong> – 07.<br />

8. Receipt of Application<br />

The last date for receipt of application and for submission of claims for<br />

financial assistance for each year will be separately notified.<br />

05/09/05 DIRECTOR (P&PD)<br />

Page : 8<br />

Sd/-


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

Annexure - 1<br />

APPLICATION FOR FINANCIAL ASSISTANCE TO TSR AND<br />

RUBBERWOOD FACTORIES<br />

1. Name & address of the Processor :<br />

2. Processor’s Licence No. :<br />

3. Sector : RPS / Co-op / Private<br />

4. Address of the Factory :<br />

5. Date of commissioning :<br />

6. Name of Product :<br />

7. Installed Capacity :<br />

8. Average Production :<br />

9. Details of machinery /<br />

Equipment/ Works proposed<br />

under modernization, showing<br />

cost of each and total.<br />

(Attach additional sheet, if<br />

required)<br />

10. Name of the Chief Executive<br />

Officer<br />

11. Signature with date and seal of<br />

the applicant<br />

Page : 9<br />

:<br />

:<br />

:


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

FORM OF RESOLUTION<br />

(Please retype the form with applicable terms only)<br />

Page : 10<br />

Annexure -2<br />

True copy of the Resolution to be passed by the <strong>Board</strong> of Directors<br />

of……………………………………………………………………………………………<br />

……………………… in connection with their application for financial assistance under<br />

<strong>Rubber</strong> <strong>Board</strong>’s Scheme for modernization of Technically Specified <strong>Rubber</strong> (TSR) and<br />

<strong>Rubber</strong>wood Processing Factories in India for their Latex Centrifuging / Block <strong>Rubber</strong> /<br />

<strong>Rubber</strong>wood Processing Factory located at ………………with Processor’s License<br />

No…………………….<br />

<strong>Board</strong> Resolution No……………………………..dt…………………………….<br />

Resolved to apply to <strong>Rubber</strong> <strong>Board</strong> for grant of financial assistance of<br />

Rs……………... (Rupees…………………………………………………………) under<br />

<strong>Rubber</strong> <strong>Board</strong>’s Rules for Financial Assistance to TSR and <strong>Rubber</strong>wood Processing<br />

Factories for the modernization of its Latex Centrifuging / Block <strong>Rubber</strong> / <strong>Rubber</strong>wood<br />

Processing Factory located at………………………………………………………………<br />

<strong>Board</strong> Resolution No.………………………………..dt…………………………<br />

Resolved further to authorize the Chief Executive Shri…………………<br />

(Name and designation) of the Society / Company / Concern to apply for financial<br />

assistance from <strong>Rubber</strong> <strong>Board</strong> and to execute necessary agreements prescribed by the<br />

<strong>Rubber</strong> <strong>Board</strong>, on behalf of the Society / Company / Partnership / Proprietorship Concern<br />

<strong>Board</strong> Resolution No.………………………………..dt…………………………<br />

Resolved to abide by the terms and conditions specified by the <strong>Rubber</strong> <strong>Board</strong> in<br />

the Rules for providing financial assistance to TSR factories, as amended from time to<br />

time.


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

(On Rs.50/- stamp paper)<br />

Page : 11<br />

Annexure - 3<br />

THIS AGREEMENT made on the ……..……………………. day of<br />

……………………………Two Thousand Two and executed between<br />

M/s ……………………………….. a company / co-operative society/<br />

partnership / proprietorship concern registered under……………..…….with<br />

registered office at……………(hereinafter referred to as the ‘Processor’<br />

which expression where the context admits shall also mean and include it’s<br />

successors and assigns) represented by its Managing Director/Director /<br />

Managing Partner/ Sole Proprietor Shri………………………………………<br />

………………………………aged ………………… son of<br />

Shri…………….…………………………………………………… residing<br />

at……………………….on the one part and the <strong>Rubber</strong> <strong>Board</strong>, a statutory<br />

body corporate constituted under the <strong>Rubber</strong> Act, 1947 (Central Act XXIV<br />

of 1947) and having its head office at Kottayam in Kottayam District, Kerala<br />

State (hereinafter called the ‘<strong>Board</strong>’ which expression where the context<br />

admits shall also mean and include its successors and assigns) on the other<br />

part.<br />

WHEREAS the Processor requested the <strong>Board</strong> for financial assistance<br />

of Rs. ………….. (Rupees ………………….. only) under the rules of the<br />

Scheme for modernization of Technically Specified <strong>Rubber</strong> (TSR) and<br />

<strong>Rubber</strong>wood Processing Factories in India (hereinafter referred to as<br />

‘Rules’).<br />

AND WHEREAS the <strong>Board</strong> has agreed to sanction a sum of<br />

Rs….….. (Rupees ………………………….. only) as financial assistance<br />

under the rules, subject to the terms and conditions herein contained.<br />

NOW THEREFORE it is agreed between the parties as follows:<br />

1) That the Processor hereby undertakes to carry out all instructions<br />

issued from time to time by the <strong>Board</strong> and abide by the terms and<br />

conditions of the rules.


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

2) That the processor has to purchase the machinery / equipment as per<br />

the schedule attached herewith for which prior approval was obtained<br />

from the <strong>Board</strong> and produced the bills / vouchers of the machinery<br />

before the <strong>Board</strong> for financial assistance under the scheme.<br />

3) That the Processor hereby agrees to permit the <strong>Board</strong> or its authorized<br />

representatives for periodic inspection of the equipment / machinery<br />

for which financial assistance is granted by the <strong>Board</strong>, to ensure its<br />

proper utilization.<br />

4) That the processor hereby agrees to submit periodic reports to the<br />

<strong>Board</strong> as prescribed by the <strong>Board</strong> on the quantitative and qualitative<br />

benefits accrued as a result of the implementation of the scheme.<br />

5) That any identification mark / sticker affixed by the <strong>Board</strong> to the<br />

machinery / equipment will be maintained properly by the Processor<br />

for the purpose of the inspection by the <strong>Board</strong>.<br />

6) That the machinery / equipment for which financial assistance is<br />

granted by the <strong>Board</strong>, shall be hypothecated to the <strong>Board</strong> for ten years<br />

and remain installed in the premises of the processing factory and<br />

shall be kept free from any other hypothecation, pledge, of lien or any<br />

encumbrance whatsoever that may affect the right and interest of the<br />

Page : 12


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

<strong>Board</strong> over the machinery and equipment, except with the prior<br />

approval of the <strong>Board</strong>.<br />

7) That the Processor will maintain the machinery / equipment in good<br />

working condition.<br />

8) That the Processor will not relocate, lease, transfer or dispose off the<br />

machinery / equipment without the prior approval of the <strong>Board</strong>.<br />

9) If the Processor violates any of the terms and conditions herein<br />

contained or any provision of the rules or any of the instructions,<br />

from the <strong>Board</strong> or in case of any misappropriation of financial<br />

assistance granted by the <strong>Board</strong> or if any excess billing or<br />

manipulation in the bill / voucher is detected, the <strong>Board</strong> shall have the<br />

right to demand and enforce repayment forthwith of the entire amount<br />

of financial assistance granted by the <strong>Board</strong> along with penal interest<br />

as decided by the <strong>Board</strong>.<br />

10) For matters not specifically provided herein, the Processor hereby<br />

agrees to abide by all the terms and conditions contained in the rules,<br />

as may be amended from time to time as if these rules are set out<br />

herein and form part of the agreement.<br />

Page : 13


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

Signed, Sealed and Delivered for and on behalf of …………………….<br />

By (Authorized Signatory)<br />

In the presence of Witnesses<br />

1) …………………………………..<br />

2) …………………………………..<br />

Signed and Sealed for and on behalf of the <strong>Rubber</strong> <strong>Board</strong> by the Chairman.<br />

In the presence of Witnesses<br />

1) ………………………….<br />

2) ………………………….<br />

Page : 14


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

CEILING AMOUNT FOR FINANCIAL ASSISTANCE FOR<br />

CENEX PROCESSORS 20<strong>02</strong>-2007<br />

Item COMPONENTS<br />

1<br />

2<br />

3<br />

4<br />

Modification/addition of tanks to improve quality<br />

Page : 15<br />

Annexure – 4<br />

FINANCIAL ASSISTANCE<br />

Rs.Lakhs<br />

RPS<br />

Private Sector<br />

Co-op.Sector<br />

a. Latex reception tanks 2.5 1.25<br />

b. De -sludging tanks 3.0 1.50<br />

c. <strong>Cenex</strong> bulking tanks 2.5 1.25<br />

d. Modification of tanks/drains 0.5 0.25<br />

e. Other tanks, drains 1.5 0.75<br />

f. Minor civil works 1.5 0.75<br />

g. Latex storage sheds/roofing for tanks 6.0 3.0<br />

CEILING AMOUNT FOR ITEM 1 16.0 8.0<br />

Environmental Protection<br />

a. Modification/addition of Pollution Control Systems,<br />

Acoustic enclosures for diesel generators<br />

12.0 6.0<br />

CEILING AMOUNT FOR ITEM 2 12.0 6.0<br />

Replacement of machinery for quality<br />

improvement and to reduce cost of production<br />

a. Replacement of bowl 5.0 2.5<br />

b. Replacement of machine 20.0 10.0<br />

CEILING AMOUNT FOR ITEM 3 24.0 12.0<br />

Packaging<br />

a. Improvement of packaging systems 2.5 1.25


5<br />

6<br />

<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

b. Electronic scales 1.0 0.5<br />

CEILING AMOUNT FOR ITEM 4 3.0 1.50<br />

Quality Control<br />

a. Additional testing equipment 5 2.5<br />

b. ISO 90000/14000 certification system 1.0 0.5<br />

c. Computer and accessories including software 0.8 0.4<br />

CEILING AMOUNT FOR ITEM 5 5 2.5<br />

Energy conservation measures<br />

Implementation of recommendations of the energy audit such<br />

as power factor improvement (on load and on noload),<br />

replacement of transformer, use of high efficiency motors,<br />

replacement/modification./overhauling of old diesel generating<br />

sets.<br />

Note :<br />

Page : 16<br />

5.0 2.5<br />

CEILING AMOUNT FOR ITEM 6 5.0 2.5<br />

1. The financial assistance will be 50% / 25% of the expenditure approved by the <strong>Board</strong> for the<br />

Machinery/Equipment/Works/Service as the case may or the ceiling amount as specified above<br />

whichever is less.<br />

2. The financial assistance to private sector will be further limited to Rs. 20 lakhs.<br />

3. The financial assistance to RPS/Co-operative sector will be further limited to Rs. 40 lakhs.


<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

GENERAL GUIDELINES<br />

Page : 17<br />

Annexure – 5.<br />

1. The processor should obtain all statutory clearances for<br />

modification/installation of additional machinery/ equipment from<br />

authorities like, Local Bodies. Factories and Boilers, KSEB,<br />

Electrical Inspectorate etc.<br />

2. Approval from Pollution Control <strong>Board</strong> should be obtained for<br />

modification/alteration of the effluent treatment system..<br />

3. The machinery/equipment should carry ISI mark as far as possible.<br />

4. The machinery/equipment should have adequate safety features to<br />

ensure the safety of men, materials, machinery and the surroundings.<br />

5. The enquiry for procurement of machinery/equipment should<br />

contain specifications including material specifications.<br />

6. The machinery/equipment should perform satisfactorily with<br />

respect to output and its quality and should suited for continuous<br />

duty and the working environment. They must also conformed to<br />

the standards prescribed by all statutory authorities like Pollution<br />

Control <strong>Board</strong>, Electrical Inspectorate, Directorate of Factories and<br />

Boilers etc<br />

7. Only proven and brand-new machinery/equipment with adequate<br />

after sales service will be considered for financial assistance under<br />

the scheme.<br />

8. The supplier should guarantee satisfactory performance at least for<br />

12 months from the date of commencing or 18 months from the date<br />

of supply whichever is earlier.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!