SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
5<br />
6<br />
<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />
------------------------------------------------------------------------------------------------------------------------------------------------<br />
b. Electronic scales 1.0 0.5<br />
CEILING AMOUNT FOR ITEM 4 3.0 1.50<br />
Quality Control<br />
a. Additional testing equipment 5 2.5<br />
b. ISO 90000/14000 certification system 1.0 0.5<br />
c. Computer and accessories including software 0.8 0.4<br />
CEILING AMOUNT FOR ITEM 5 5 2.5<br />
Energy conservation measures<br />
Implementation of recommendations of the energy audit such<br />
as power factor improvement (on load and on noload),<br />
replacement of transformer, use of high efficiency motors,<br />
replacement/modification./overhauling of old diesel generating<br />
sets.<br />
Note :<br />
Page : 16<br />
5.0 2.5<br />
CEILING AMOUNT FOR ITEM 6 5.0 2.5<br />
1. The financial assistance will be 50% / 25% of the expenditure approved by the <strong>Board</strong> for the<br />
Machinery/Equipment/Works/Service as the case may or the ceiling amount as specified above<br />
whichever is less.<br />
2. The financial assistance to private sector will be further limited to Rs. 20 lakhs.<br />
3. The financial assistance to RPS/Co-operative sector will be further limited to Rs. 40 lakhs.