10.04.2013 Views

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5<br />

6<br />

<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

b. Electronic scales 1.0 0.5<br />

CEILING AMOUNT FOR ITEM 4 3.0 1.50<br />

Quality Control<br />

a. Additional testing equipment 5 2.5<br />

b. ISO 90000/14000 certification system 1.0 0.5<br />

c. Computer and accessories including software 0.8 0.4<br />

CEILING AMOUNT FOR ITEM 5 5 2.5<br />

Energy conservation measures<br />

Implementation of recommendations of the energy audit such<br />

as power factor improvement (on load and on noload),<br />

replacement of transformer, use of high efficiency motors,<br />

replacement/modification./overhauling of old diesel generating<br />

sets.<br />

Note :<br />

Page : 16<br />

5.0 2.5<br />

CEILING AMOUNT FOR ITEM 6 5.0 2.5<br />

1. The financial assistance will be 50% / 25% of the expenditure approved by the <strong>Board</strong> for the<br />

Machinery/Equipment/Works/Service as the case may or the ceiling amount as specified above<br />

whichever is less.<br />

2. The financial assistance to private sector will be further limited to Rs. 20 lakhs.<br />

3. The financial assistance to RPS/Co-operative sector will be further limited to Rs. 40 lakhs.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!