10.04.2013 Views

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />

------------------------------------------------------------------------------------------------------------------------------------------------<br />

15. The applicant shall hypothecate the equipment/ machinery purchased and<br />

any building constructed / work done under this scheme to the <strong>Rubber</strong><br />

<strong>Board</strong> for a minimum period of 10 years.<br />

16. Notwithstanding the fulfillment of any or all of the conditions under these<br />

rules, the Chairman, <strong>Rubber</strong> <strong>Board</strong> has discretionary powers to grant or<br />

refuse the claim or to limit the assistance to a particular amount.<br />

17. The Chairman, <strong>Rubber</strong> <strong>Board</strong> will have the powers to alter / modify any of<br />

the provisions of these rules for the smooth operation of the scheme.<br />

18. The actual release of the amount shall only be made on compliance with all<br />

the formalities/conditions as stated above and on production of the<br />

following documents:<br />

a. Machinery – Quotation, evaluation statement, invoice, cash receipt,<br />

proof of delivery, installation etc.<br />

b. Details of cost of building / works with estimates, measurement and<br />

bills<br />

c. Installation of the machinery / equipment indicating basic price,<br />

installation charges, transportation, taxes etc.<br />

d. Entry of items in Stock Register/ Asset Register<br />

e. Performance certificate by the Authorized Engineer of the <strong>Rubber</strong><br />

<strong>Board</strong>.<br />

f. Interest Subsidy – Certificate from Financial Institution showing the<br />

details of interest paid during the relevant period.<br />

g. Reports/recommendations of the consultants engaged by the<br />

processor.<br />

Page : 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!