SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
SR2 - X Plan Modernisation - Cenex[Revised-_01-02 - Rubber Board
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>SR2</strong> – X <strong>Plan</strong> <strong>Modernisation</strong> – <strong>Cenex</strong> 27/06/03<br />
------------------------------------------------------------------------------------------------------------------------------------------------<br />
4. Activities<br />
The following activities are eligible for financial assistance.<br />
1. Modification/addition of tanks for desludging, bulking, including<br />
stirrers, lining with ceramic tiles etc.<br />
2. Procuring equipment for testing, quality control and implementation of<br />
ISO 9000/14000 certification systems.<br />
3. Improvements in packaging for field latex and latex concentrate.<br />
4. Procurement of computer and its accessories including software.<br />
5. Procurement of spare bowl and replacement of centrifuging machine for<br />
improving efficiency and productivity.<br />
6. Electronic weighing scales for packing of latex concentrate.<br />
7. Modification/addition to pollution control system to include biomass<br />
conversion and utilization to control air and water pollution.<br />
8. Sheds for storage of field latex/latex concentrate in barrels and roofing<br />
for storage tanks.<br />
9. Acoustic enclosures for diesel generators under environmental<br />
protection.<br />
10. Implementation of recommendations of the energy audit such as power<br />
factor improvement (on load and on no load), replacement of<br />
transformer, use of high efficiency motors, replacement/<br />
modification./overhauling of old diesel generating sets.<br />
Page : 2