A380: the countdown is on - Orient Aviation
A380: the countdown is on - Orient Aviation
A380: the countdown is on - Orient Aviation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
SUPPLIERS<br />
By Charles Anders<strong>on</strong><br />
It’s not <strong>on</strong>ly Airbus that <str<strong>on</strong>g>is</str<strong>on</strong>g> laying its<br />
m<strong>on</strong>ey <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> line with <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>A380</str<strong>on</strong>g><br />
programme. The project’s r<str<strong>on</strong>g>is</str<strong>on</strong>g>ksharing<br />
partners are supplying<br />
US$3 billi<strong>on</strong> out of <str<strong>on</strong>g>the</str<strong>on</strong>g> total<br />
US$10.7 billi<strong>on</strong> investment necessary to<br />
get <str<strong>on</strong>g>the</str<strong>on</strong>g> plane in <str<strong>on</strong>g>the</str<strong>on</strong>g> air – and some US$2.1<br />
billi<strong>on</strong> of that has come from aerostructure<br />
manufacturers.<br />
Look at <str<strong>on</strong>g>the</str<strong>on</strong>g> roll call of structures<br />
suppliers and many of <str<strong>on</strong>g>the</str<strong>on</strong>g> big names are<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g>re: GKN Aerospace Services of <str<strong>on</strong>g>the</str<strong>on</strong>g> UK,<br />
EADS Ausburg from Germany, Goodrich<br />
from <str<strong>on</strong>g>the</str<strong>on</strong>g> U.S. Alenia Aer<strong>on</strong>autica from<br />
Italy as well as Eurocopter, Fokker/Stork<br />
and Saab, to name just a few.<br />
Not all companies <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>A380</str<strong>on</strong>g> l<str<strong>on</strong>g>is</str<strong>on</strong>g>t are<br />
r<str<strong>on</strong>g>is</str<strong>on</strong>g>k-sharing partners by any means. It <str<strong>on</strong>g>is</str<strong>on</strong>g><br />
<strong>on</strong>ly <str<strong>on</strong>g>the</str<strong>on</strong>g> big companies that can afford that.<br />
Participati<strong>on</strong> in some instances also goes<br />
back to framework agreements signed at <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
time of <str<strong>on</strong>g>the</str<strong>on</strong>g> A3XX programme. Th<str<strong>on</strong>g>is</str<strong>on</strong>g> time,<br />
however, <str<strong>on</strong>g>the</str<strong>on</strong>g>re was a competitive process<br />
based typically <strong>on</strong> a company’s know-how<br />
and Airbus experience.<br />
The Asia-Pacific <str<strong>on</strong>g>is</str<strong>on</strong>g> also playing a part,<br />
led by Hawker de Havilland, Australia,<br />
which <str<strong>on</strong>g>is</str<strong>on</strong>g> making wing tips and <str<strong>on</strong>g>the</str<strong>on</strong>g> wing-tip<br />
fence, Korea Aerospace Industries (KAI),<br />
supplying <str<strong>on</strong>g>the</str<strong>on</strong>g> outboard panel assembly<br />
bottom, and CTRM of Malaysia which has<br />
been sub-c<strong>on</strong>tracted by BAE Systems to<br />
make wing comp<strong>on</strong>ents.<br />
Also, <str<strong>on</strong>g>the</str<strong>on</strong>g>re are two of Japan’s “heavies”,<br />
Fuji and Mitsub<str<strong>on</strong>g>is</str<strong>on</strong>g>hi Heavy Industries, as<br />
well as Jamco, Nippi and Shin Maywa –<br />
a qualified breakthrough for Airbus in a<br />
country closely associated with Boeing<br />
and which <str<strong>on</strong>g>is</str<strong>on</strong>g> accounting for 35% of <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
manufacture of Boeing’s 7E7. There were<br />
hopes that Japan would join <str<strong>on</strong>g>the</str<strong>on</strong>g> r<str<strong>on</strong>g>is</str<strong>on</strong>g>k sharers,<br />
but that was not to be.<br />
“Although our percentage remains low, at<br />
least we have managed to stick <str<strong>on</strong>g>the</str<strong>on</strong>g> Airbus flag<br />
in Japan. It was a significant achievement to<br />
get <str<strong>on</strong>g>the</str<strong>on</strong>g>m <strong>on</strong> board,” said Charles Champi<strong>on</strong>,<br />
executive vice-president, <str<strong>on</strong>g>A380</str<strong>on</strong>g> programme.<br />
China <str<strong>on</strong>g>is</str<strong>on</strong>g> represented through a subc<strong>on</strong>tracting<br />
deal by Latecoere of France with<br />
China Aviati<strong>on</strong> Industry Corp I (AVIC I) for<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> upper and lateral panels of <str<strong>on</strong>g>the</str<strong>on</strong>g> nose landing<br />
gear bay.<br />
Primary work was not offered, Champi<strong>on</strong><br />
said, because <str<strong>on</strong>g>the</str<strong>on</strong>g> Chinese aviati<strong>on</strong> industry<br />
<str<strong>on</strong>g>is</str<strong>on</strong>g> at present oriented towards manufacturing<br />
without having a str<strong>on</strong>g design capability.<br />
On <str<strong>on</strong>g>the</str<strong>on</strong>g> equipment side, leading vendors<br />
R<str<strong>on</strong>g>is</str<strong>on</strong>g>k sharing,<br />
<strong>on</strong> a global scale<br />
‘ Although our percentage<br />
remains low, at least we have<br />
managed to stick <str<strong>on</strong>g>the</str<strong>on</strong>g> Airbus<br />
[suppliers] flag in Japan. It was<br />
a significant achievement to<br />
get <str<strong>on</strong>g>the</str<strong>on</strong>g>m <strong>on</strong> board’<br />
Charles Champi<strong>on</strong>,<br />
Executive vice-president,<br />
<str<strong>on</strong>g>A380</str<strong>on</strong>g> programme<br />
include Goodrich, H<strong>on</strong>eywell, Dunlop,<br />
Hamilt<strong>on</strong> Sundstrand, KID, Messier-<br />
Bugatti, Messier-Dowty, Rockwell Collins,<br />
Smiths Aerospace and Thales Avi<strong>on</strong>ics.<br />
The fact Airbus <str<strong>on</strong>g>is</str<strong>on</strong>g> now a single company<br />
helped smooth <str<strong>on</strong>g>the</str<strong>on</strong>g> process. Th<str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>is</str<strong>on</strong>g> <str<strong>on</strong>g>the</str<strong>on</strong>g> first<br />
programme to be launched since restructuring<br />
and that meant <str<strong>on</strong>g>the</str<strong>on</strong>g> old way of doing things<br />
could be forgotten. Many American firms<br />
are now <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> roster as a result.<br />
“For <str<strong>on</strong>g>the</str<strong>on</strong>g> first time [we] were able to<br />
select with a full picture, because in <str<strong>on</strong>g>the</str<strong>on</strong>g> past<br />
selecti<strong>on</strong> was made by our former partners.<br />
Then we had customer services and<br />
customer support <strong>on</strong> <str<strong>on</strong>g>the</str<strong>on</strong>g> Airbus side. It was<br />
difficult to put all <str<strong>on</strong>g>the</str<strong>on</strong>g> elements toge<str<strong>on</strong>g>the</str<strong>on</strong>g>r,”<br />
said Champi<strong>on</strong>.<br />
22 ORIENT AVIATION / <str<strong>on</strong>g>A380</str<strong>on</strong>g> Quarterly Update DECEMBER 2004-FEBRUARY 2005<br />
“Basically we did a full comparative<br />
selecti<strong>on</strong> process, looking at all <str<strong>on</strong>g>the</str<strong>on</strong>g> aspects<br />
of <str<strong>on</strong>g>the</str<strong>on</strong>g> business, not <strong>on</strong>ly <str<strong>on</strong>g>the</str<strong>on</strong>g> performance,<br />
weight and cost, but also reliability, mean time<br />
between failure and <str<strong>on</strong>g>the</str<strong>on</strong>g> direct maintenance<br />
costs. We completely opened <str<strong>on</strong>g>the</str<strong>on</strong>g> door.<br />
“As a result we selected some vendors<br />
we had never chosen before. One of <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
first, after <str<strong>on</strong>g>the</str<strong>on</strong>g> programme was launched<br />
in February 2001, was Goodrich for <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
landing gear. We have never, never installed<br />
landing gear from Goodrich before. It was<br />
ei<str<strong>on</strong>g>the</str<strong>on</strong>g>r Messier or Dowty.<br />
“It was a very str<strong>on</strong>g sign to <str<strong>on</strong>g>the</str<strong>on</strong>g> industry<br />
that <str<strong>on</strong>g>the</str<strong>on</strong>g> game was open. Afterwards we<br />
selected some vendors that we were already<br />
working with <strong>on</strong> o<str<strong>on</strong>g>the</str<strong>on</strong>g>r programmes. If <str<strong>on</strong>g>the</str<strong>on</strong>g>y<br />
have been sat<str<strong>on</strong>g>is</str<strong>on</strong>g>factory, <str<strong>on</strong>g>the</str<strong>on</strong>g>y are in pole<br />
positi<strong>on</strong>. If you have developed soluti<strong>on</strong>s<br />
for <str<strong>on</strong>g>the</str<strong>on</strong>g> A320 and A340, you have a better<br />
knowledge and can minim<str<strong>on</strong>g>is</str<strong>on</strong>g>e your r<str<strong>on</strong>g>is</str<strong>on</strong>g>k<br />
factor.<br />
“Never<str<strong>on</strong>g>the</str<strong>on</strong>g>less, we selected Hamilt<strong>on</strong><br />
Sundstrand for <str<strong>on</strong>g>the</str<strong>on</strong>g> air c<strong>on</strong>diti<strong>on</strong>ing for <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
first time. We just took a very open approach:<br />
<str<strong>on</strong>g>the</str<strong>on</strong>g> best guy wins.<br />
“All in all, we had a good selecti<strong>on</strong> process.<br />
It was transparent and, to my knowledge,<br />
although usually <str<strong>on</strong>g>the</str<strong>on</strong>g>re are some shouts<br />
and complaints, we didn’t have any major<br />
challenges.”<br />
Take <str<strong>on</strong>g>the</str<strong>on</strong>g> <str<strong>on</strong>g>A380</str<strong>on</strong>g>’s engines out of <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
equati<strong>on</strong> and Champi<strong>on</strong> reck<strong>on</strong>s European<br />
and U.S. vendors have w<strong>on</strong> a 50-50 split.<br />
Global<str<strong>on</strong>g>is</str<strong>on</strong>g>ati<strong>on</strong>, however, muddies <str<strong>on</strong>g>the</str<strong>on</strong>g> picture<br />
somewhat.<br />
“We have U.S. vendors with subsidiaries<br />
in Europe and European vendors with<br />
subsidiaries in <str<strong>on</strong>g>the</str<strong>on</strong>g> U.S. It <str<strong>on</strong>g>is</str<strong>on</strong>g> ra<str<strong>on</strong>g>the</str<strong>on</strong>g>r more<br />
difficult to identify <str<strong>on</strong>g>the</str<strong>on</strong>g>m now,” said<br />
Champi<strong>on</strong>.<br />
“We have managed quite well to get<br />
away from <str<strong>on</strong>g>the</str<strong>on</strong>g> image that we are being<br />
self influenced by <str<strong>on</strong>g>the</str<strong>on</strong>g> past. There was good<br />
competiti<strong>on</strong> between <str<strong>on</strong>g>the</str<strong>on</strong>g> vendors. In some<br />
cases, we were already working with <str<strong>on</strong>g>the</str<strong>on</strong>g>m;<br />
in o<str<strong>on</strong>g>the</str<strong>on</strong>g>r cases <str<strong>on</strong>g>the</str<strong>on</strong>g>y were from outside <str<strong>on</strong>g>the</str<strong>on</strong>g><br />
system. I think it brought in some fresh<br />
air.”