12.04.2013 Views

MODULAR ARMORED TACTICAL COMBAT HOUSE - Action Target

MODULAR ARMORED TACTICAL COMBAT HOUSE - Action Target

MODULAR ARMORED TACTICAL COMBAT HOUSE - Action Target

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

6 ACTIONTARGET.COM<br />

DEPLOYA BILIT Y<br />

Q<br />

IndIvIduAl lIve-fIre MATCH buIldIngs CAn Also be ereCTed u<br />

In As lITTle As 2 dAys, wITH enTIre vIllAges goIng up In As<br />

lITTle As 30 dAys.<br />

Is MATCH A perMAnenT sTruCTure, or<br />

CAn IT be deployed To oTHer AreAs?<br />

One of the many advantages of <strong>Action</strong> <strong>Target</strong>’s MATCH system<br />

is the ability to deploy true live-fire buildings quickly and efficiently.<br />

Your people may not be able to travel to a training facility, so<br />

we bring the training facility to them. The MATCH system is<br />

made of armor steel plates that stack compactly and go<br />

together quickly. This modular approach allows for large and<br />

reconfigurable live-fire rooms and buildings that far exceed<br />

the size of the container they are shipped in. Unlike other<br />

approaches that use unnecessarily bulky materials, the MATCH<br />

system can fit the components for an entire building inside a<br />

single 20-foot container.<br />

In 2005, <strong>Action</strong> <strong>Target</strong> was given the critical mission of building<br />

and transporting an entire live-fire village to Baghdad, Iraq. This<br />

village was used to provide U.S. Military personnel with critical<br />

training that was necessary to protect lives in their immediate<br />

combat mission. Each of the 12 buildings was completely<br />

assembled at our factory in Utah, then rapidly disassembled<br />

and loaded into containers for shipping.<br />

Because no welding is involved, MATCH buildings can be<br />

completely disassembled and transported to alternate training<br />

sites for a week, a month, or as long as you need to there. They can<br />

be reconfigured as training requirements mandate, with complete<br />

large scale reconfigurations typically accomplished in 2 days.<br />

In 2005, ACTIon TArgeT wAs gIven THe CrITICAl u<br />

MIssIon of buIldIng And TrAnsporTIng An<br />

enTIre lIve-fIre CITy To bAgHdAd, IrAq.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!