19.04.2013 Views

executive summary kitimat lng terminal project comprehensive study ...

executive summary kitimat lng terminal project comprehensive study ...

executive summary kitimat lng terminal project comprehensive study ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pursuant to the requirements of the BC Environmental Assessment Act<br />

(BCEAA), EAO is satisfied that:<br />

• The process and documents generated as part of this EA adequately identify<br />

and address the potential adverse environmental, land use, socio-economic,<br />

public safety and health, heritage, navigable waters and First Nations effects;<br />

• Public and First Nations consultation, and the distribution of information have<br />

been adequate;<br />

• Issues identified during the review process by the public, the Haisla, federal,<br />

provincial and local government agencies have been adequately addressed<br />

by the Proponent during the review of the Application; and<br />

• Practical means have been identified to prevent or reduce to an acceptable<br />

level any potential adverse effects.<br />

Pursuant to the requirements of the CEAA, the federal RAs have determined<br />

that, on the basis of this CSR, and provided that the Proponent conducts the<br />

mitigation measures as described, the Project is not likely to cause significant<br />

adverse environmental effects whether it is located at either Emsley Cove or Bish<br />

Cove.<br />

Executive Summary-KLNG Terminal Project 13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!