(DFO), and Natural Resources Canada provided advice to the environmental<br />

assessment.<br />

The federal RAs determined that the Project requires a Comprehensive Study<br />

Review under CEAA because a component of the <strong>project</strong> meets the<br />

requirements of paragraph 13(d) of the Comprehensive Study Regulations. This<br />

was confirmed by the federal Minister of Environment after public review of a<br />

federal Scoping Document early in the review process.<br />

DFO has conducted a screening level environmental assessment of the Project<br />

pursuant to the CEAA, but participated in the joint assessment process and will<br />

use this joint federal-provincial report to inform its screening level assessment.<br />

The provincial and federal assessment processes have been harmonized in<br />

accordance with the Canada/British Columbia Agreement for Environmental<br />

Assessment Cooperation (2004).<br />

Scope of the Joint Environmental Assessment<br />

The scope of assessment includes the consideration of the potential effects of<br />

the Project, including environmental, social, economic, health and heritage<br />

effects and potential effects on aboriginal interests, taking into account practical<br />

means of preventing or reducing to an acceptable level any potential adverse<br />

effects of the Project.<br />

The scope of assessment under CEAA defines additional factors to be<br />

considered. These include: alternative means of carrying out the Project that<br />

are technically and economically feasible and the environmental effects of any<br />

such alternative means; environmental effects of malfunctions or accidents;<br />

potential cumulative environmental effects; the significance of the environmental<br />

effects; measures that would mitigate significant adverse environmental effects;<br />

the capacity of renewable resources likely to be significantly affected; and a<br />

follow-up program.<br />

Specifically, the assessment has considered air quality, visual quality, noise<br />

levels, freshwater and marine ecosystems, terrestrial ecosystems, wildlife and<br />

fisheries, vegetation, navigation, and social, economic, cultural and heritage<br />

values.<br />

Public Consultation<br />

Consultation with the general public occurred primarily in response to EAO and<br />

federal RA requirements. The Proponent initiated a public and local government<br />

consultation program in April 2000. In the Application review stage, a 45 day<br />

public review and comment period was held to obtain feedback on the Project<br />

Application, and included 3 public open houses and a Haisla community meeting.<br />

Executive Summary-KLNG Terminal Project 4