An additional 30 day public review period was established to allow public<br />

comments on the supplementary information generated by the Proponent for a<br />

more through assessment of the Bish Cove location. A public meeting was held<br />

by EAO on the Bish Cove plans and assessment work during this second review<br />

period, at the request of the District of Kitimat Council. Relevant Project<br />

information and correspondence was made available to the public on the EAO<br />

web site and the Proponent’s web site.<br />

In the formal June 15 to July 30, 2005 public comment period for the Application<br />

review, 44 written comments were received from members of the public, in<br />

addition to a number of comments provided during the three open house<br />

meetings.<br />

During the 30 day review period and associated public meeting on<br />

supplementary information related to Bish Cove, 3 written responses and 11<br />

questions/comments were received (the latter made verbally at the public<br />

meeting).<br />

In general, almost all comments made during the initial 45-day formal review and<br />

the public open houses were favourable and supportive of the Project, as initially<br />

proposed for Emsley Cove. The public review and meeting subsequently held for<br />

the Bish Cove site also confirmed public support for the Project if located at Bish<br />

Cove.<br />

The public participation for the federal environmental assessment process<br />

followed the provincial process while including additional participation steps<br />

required for a <strong>comprehensive</strong> <strong>study</strong>. These included the advertising and public<br />

review of the federal Scoping Document, and the provision of participant funding<br />

for participation in the environmental assessment process. Relevant information<br />

was also been placed on the Canadian Environmental Assessment Registry<br />

(CEAR).<br />

Six submissions were received as a result of the public participation on the CEAA<br />

scoping document. These submissions were of a nature that provided the<br />

Minister of Environment with sufficient information to confirm the <strong>comprehensive</strong><br />

<strong>study</strong> as an appropriate level of review for the Project.<br />

All issues raised by the public during the review of the Project have been<br />

considered in the Application review process and the documents generated as<br />

part of the review.<br />

The public is also being provided with a formal public review opportunity to<br />

provide input on this joint report under CEAA. All comments submitted will be<br />

provided to the RAs and will become part of the public registry for the Project.<br />

The RAs will confirm whether or not their conclusions have been altered as a<br />

result of the public comments received.<br />