25.04.2013 Views

00642 Verges Booklet - Devon County Council

00642 Verges Booklet - Devon County Council

00642 Verges Booklet - Devon County Council

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Within urban areas there may be a wildlife or amenity justification for<br />

reducing the frequency of cutting or for avoiding certain sensitive<br />

periods.<br />

Partnership arrangements for commissioning the highway and amenity<br />

work are encouraged where appropriate.<br />

The grass cutting policy on housing estate roads adopted by the<br />

<strong>County</strong> <strong>Council</strong> shall be as above. However, behind footways the<br />

verges will be regarded generally as the responsibility of the City,<br />

Borough or District <strong>Council</strong>.<br />

(ii) Roads within Rural Areas<br />

Cutting on visibility areas (junctions, lay-bys<br />

and the inside of bends) is undertaken on an<br />

as needs basis, a frequency of two or three<br />

times per annum on maintenance category<br />

3 to 8 roads, and once on category 9 and 10<br />

roads has proved adequate.<br />

<strong>Verges</strong> on roads with a maintenance category of 3 to 8 inclusive are<br />

cut to a width of one metre from the road side channel twice per year<br />

with an intermediate cut only if shown to be absolutely necessary.<br />

Cutting on rural verges with a maintenance category of 9 or 10 is<br />

completed once per annum and a second cut will only be undertaken:<br />

(a) in a prolific growing season, or<br />

(b) at a location with particularly vigorous<br />

growth, or<br />

(c) where only one cut would create a<br />

road safety hazard.<br />

A full width cut (the autumn cut on maintenance category 3 to 8) is<br />

undertaken every third year to control the excessive growth of<br />

brushwood, scrub and harmful weeds.<br />

Cutting is undertaken to a residual height of 100mm.<br />

The timing of the cuts is to be at the discretion of the Area Highway<br />

Management Office or Agent Authority as appropriate but should take

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!