25.04.2013 Views

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

5. National and river basin regimes: main developments<br />

Once the impact of national regulation on the <strong>Matarraña</strong> river basin practices has been<br />

analysed, and once actors operating at several levels of governance have been<br />

characterised, the following section presents a table in which the national and river<br />

basin developments are chronologically summarised. The aim of this table is briefly<br />

showing the extent to which both the national and river basin regime evolve towards<br />

integrated regimes, and what the main connections in both processes are. This<br />

summarising table will allow for the understanding of the following section, in which the<br />

phases towards integration in the <strong>Matarraña</strong> river case will be analysed in detail.<br />

First Water Act<br />

Civil Code<br />

National developments<br />

The Plan for Hydraulic Works is adopted<br />

The CHE is created<br />

The Franco regime suppresses the<br />

representation of users in the<br />

Hydrographical Confederations<br />

The Spanish Constitution is adopted<br />

The government adopts a Decree<br />

recovering the participatory nature of<br />

Hydrographical Confederations (with<br />

representation of administrations,<br />

irrigation communities, hydroelectric<br />

companies and industrial users)<br />

Date<br />

1886/<br />

1879<br />

1889<br />

1902<br />

1906<br />

1926<br />

1930<br />

1942<br />

1950<br />

1955<br />

1970s<br />

1978<br />

1978<br />

1979<br />

<strong>Matarraña</strong> river basin developments<br />

The plan includes the regulation of the<br />

<strong>Matarraña</strong> river basin<br />

The Pena water dam is authorised<br />

The Pena water dam is finished<br />

The Central Union is created<br />

The Central Union alerts of the<br />

insufficient water provided by the Pena<br />

dam<br />

Expansion of peach crops<br />

The CHE builds a diversion tunnel<br />

41

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!