25.04.2013 Views

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Subphase 1: 1902 – 1930<br />

First regulation of the<br />

<strong>Matarraña</strong> river basin<br />

Subphase 2: 1931 – 1950<br />

Construction of the Pena<br />

dam: adaptation of water<br />

uses and demands<br />

Subphase 3: 1951 – 1977<br />

First period: 1902 – mid eighties<br />

Traditional perspective: regulation through large hydraulic infrastructures<br />

Change in water resource<br />

administration<br />

Subphase 4: 1978 – mid 80s<br />

New regulation and severe<br />

draught<br />

Phase 1: mid 80s – 1994<br />

Dominica of the traditional<br />

problem definition and actors<br />

Phase 2: 1995 – 1999<br />

Collision between the<br />

traditional and a new resource<br />

conservation problem<br />

definitions and actors<br />

Phase 3: 2000 <br />

Agreement:<br />

Integration of the traditional<br />

and the conservation problem<br />

definitions and actors<br />

- 1902 (First) National Hydraulic Plan include the regulation of the<br />

<strong>Matarraña</strong> river basin<br />

- Construction of the Pena Dam (unique regulation infrastructure within<br />

the basin)<br />

44<br />

- Water management is adapted to the new available resources<br />

- Redistribution of water uses and demands<br />

- Creation of the Central Union of Irrigation Communities of the<br />

<strong>Matarraña</strong> river basin:<br />

- Centralisation of decisions on water resources stored in the Pena Dam<br />

- Representation of irrigation farmers interests<br />

- Increase of water demands<br />

- Severe drought period resulting in the first social conflicts<br />

- Construction of the diversion tunnel<br />

Second period: Mid eighties – 2000 onwards<br />

Signals of transition from a traditional towards an integrated regime<br />

- 1985 Water Act<br />

- Drought period (1992-1995)<br />

- Intensification of social demands for water regulation projects<br />

- Proposal of pumping water from the <strong>Matarraña</strong> to the Pena Dam<br />

- Pumping project included in State regulation as an urgent measure<br />

to palliate drought effects<br />

- Social and territorial conflict between the high and middle-low basin:<br />

nature conservation versus regulation demands<br />

- Negotiation among the basin actors: first attempts to reach an<br />

agreement<br />

- Agreement among the basin actors: integration of water problem<br />

definition and actors

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!