25.04.2013 Views

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

Case Study 1: Matarraña River Basin - Euwareness

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Aug - Adoption of the 29/85 Water Act:<br />

hydraulic public domain (continental,<br />

natural flows lakes and ground waters)<br />

Extremely dry year<br />

Apr – Reglament of Hydraulic Public<br />

Domain<br />

The ICONA (national administration)<br />

elaborates an inventory for important<br />

waters by virtue of 78/659 Directive<br />

The Aragon Parliament adopts the “Water<br />

Agreement”, including the Torre del<br />

Compte dam (29 hm3)<br />

Starts an extremely dry period<br />

The national government (PSOE)<br />

proposes a National Hydrological Plan. It<br />

is firmly contested and fails.<br />

May - The national government (PP)<br />

adopts a Decree approving urgent<br />

measures against draught, including the<br />

pumping project in the river basin<br />

Dry year<br />

regulation change<br />

The CHE elaborates the Ebro river basin<br />

plan<br />

The 46/1999 Water Act partially reforms<br />

the 29/1985 Water Act: ecological flow is<br />

not considered as use of water but as a<br />

restriction imposed to exploitation<br />

systems; water markets are recognised<br />

1985<br />

1986<br />

1990<br />

1992<br />

1993<br />

1995<br />

1996<br />

1997<br />

1998<br />

1999<br />

Extreme draught at the <strong>Matarraña</strong> river<br />

basin<br />

The inventory includes the <strong>Matarraña</strong><br />

river<br />

Starts an extremely dry period<br />

Jul - The CHE initiates the works of<br />

pumping project<br />

transition<br />

Intense mobilisations against leaded by<br />

the Association of Expropriated in<br />

Beceite. Slogan: “Living <strong>Matarraña</strong><br />

Alive”<br />

The works of the pumping project start<br />

and shortly after are paralysed.<br />

Oct – The works of the pumping project<br />

start again<br />

42<br />

Oct - SEO-Bird Life presents a complaint<br />

to the European Commission<br />

Extreme draught at the <strong>Matarraña</strong> river<br />

basin<br />

Pladema is legally constituted<br />

Mar - The pumping project is finished<br />

Feb – The CHE announces the<br />

construction of wells to take<br />

underground water

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!