Case Study 1: Matarraña River Basin - Euwareness
Case Study 1: Matarraña River Basin - Euwareness
Case Study 1: Matarraña River Basin - Euwareness
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Aug - Adoption of the 29/85 Water Act:<br />
hydraulic public domain (continental,<br />
natural flows lakes and ground waters)<br />
Extremely dry year<br />
Apr – Reglament of Hydraulic Public<br />
Domain<br />
The ICONA (national administration)<br />
elaborates an inventory for important<br />
waters by virtue of 78/659 Directive<br />
The Aragon Parliament adopts the “Water<br />
Agreement”, including the Torre del<br />
Compte dam (29 hm3)<br />
Starts an extremely dry period<br />
The national government (PSOE)<br />
proposes a National Hydrological Plan. It<br />
is firmly contested and fails.<br />
May - The national government (PP)<br />
adopts a Decree approving urgent<br />
measures against draught, including the<br />
pumping project in the river basin<br />
Dry year<br />
regulation change<br />
The CHE elaborates the Ebro river basin<br />
plan<br />
The 46/1999 Water Act partially reforms<br />
the 29/1985 Water Act: ecological flow is<br />
not considered as use of water but as a<br />
restriction imposed to exploitation<br />
systems; water markets are recognised<br />
1985<br />
1986<br />
1990<br />
1992<br />
1993<br />
1995<br />
1996<br />
1997<br />
1998<br />
1999<br />
Extreme draught at the <strong>Matarraña</strong> river<br />
basin<br />
The inventory includes the <strong>Matarraña</strong><br />
river<br />
Starts an extremely dry period<br />
Jul - The CHE initiates the works of<br />
pumping project<br />
transition<br />
Intense mobilisations against leaded by<br />
the Association of Expropriated in<br />
Beceite. Slogan: “Living <strong>Matarraña</strong><br />
Alive”<br />
The works of the pumping project start<br />
and shortly after are paralysed.<br />
Oct – The works of the pumping project<br />
start again<br />
42<br />
Oct - SEO-Bird Life presents a complaint<br />
to the European Commission<br />
Extreme draught at the <strong>Matarraña</strong> river<br />
basin<br />
Pladema is legally constituted<br />
Mar - The pumping project is finished<br />
Feb – The CHE announces the<br />
construction of wells to take<br />
underground water