Islisberg Tunnel - Marti Holding AG

Islisberg Tunnel - Marti Holding AG

Islisberg Tunnel - Marti Holding AG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Client<br />

Design<br />

Contractor<br />

Joint Venture Partners<br />

Managing Contractor and<br />

Technical Management<br />

Financial Management<br />

<strong>Islisberg</strong> <strong>Tunnel</strong><br />

Department of Public Works Canton Zurich<br />

Engineering Joint Venture N4.1.6<br />

– Electrowatt Infra <strong>AG</strong>, Zurich<br />

– Dr. Vollenweider <strong>AG</strong>, Zurich und Rapperswil<br />

– Ernst Winkler + Partner <strong>AG</strong>, Effretikon<br />

IBT Joint Venture<br />

<strong>Marti</strong> <strong>Tunnel</strong>bau <strong>AG</strong>, Berne<br />

<strong>Marti</strong> <strong>AG</strong>, Bauunternehmung, Zurich<br />

Ed. Züblin <strong>AG</strong>, Niederlassung <strong>Tunnel</strong>bau<br />

<strong>Marti</strong> <strong>Tunnel</strong>bau <strong>AG</strong>, Berne<br />

<strong>Marti</strong> <strong>AG</strong>, Bauunternehmung, Zurich<br />

<strong>Marti</strong> <strong>Holding</strong> <strong>AG</strong><br />

Bauunternehmungen<br />

<strong>Marti</strong> <strong>Holding</strong> <strong>AG</strong> Bauunternehmungen<br />

Freiburgstrasse 133 CH-3000 Berne 5 Telephone +41 31 388 75 75 Fax +41 31 388 75 01<br />

www.martiag.ch info@martiag.ch


Project<br />

A4 Autobahn road tunnel,<br />

West Uetliberg – Knonau Section, <strong>Islisberg</strong> <strong>Tunnel</strong><br />

– 2 tubes of length 4,950 m<br />

– Excavated cross section = 110 m 2<br />

– 3 ventilation centres north, south, middle<br />

– 15 cross tunnels, of these 5 are passable<br />

Geology: upper Zurich fresh water molasses<br />

Construction Period<br />

2003–2008<br />

Contract Sum<br />

CHF 235 million<br />

Services<br />

TBM drive Ø 11.86 m with prefabricated segmental lining<br />

Interior work: prefabricated services duct elements,<br />

pvc-waterproofing, concrete inner lining and suspended<br />

ceiling.<br />

Jetting drive in the soil zone at the North Portal.<br />

South drive with pipe umbrella in opposite direction.<br />

Executed by <strong>Marti</strong> <strong>AG</strong>, Bauunternehmung, Zurich /<br />

<strong>Marti</strong> <strong>Tunnel</strong>bau <strong>AG</strong>, Berne<br />

1<br />

2<br />

3<br />

1. Cutterhead<br />

2. Installation of cable duct<br />

3. Breakthrough in the West tube on 21 April 2005