Client<br />

Site Supervision<br />

Contractor<br />

Managing Contractor and<br />

Technical Management<br />

Financial Management<br />

Construction Period<br />

Contract Sum<br />

Titel<br />

2-zeilig… Pump Storage Plant Nant de Drance<br />

Nant de Drance SA, Finhaut<br />

AF-Colenco <strong>AG</strong>, Baden<br />

GMI Groupement <strong>Marti</strong> Implenia:<br />

<strong>Marti</strong> Tunnelbau <strong>AG</strong>, Moosseedorf<br />

Implenia Bau <strong>AG</strong>, Aarau<br />

<strong>Marti</strong> Tunnelbau <strong>AG</strong>, Moosseedorf<br />

Implenia Bau <strong>AG</strong>, Aarau<br />

2008–2018<br />

CHF 745 Mio.<br />

<strong>Marti</strong> <strong>Holding</strong> <strong>AG</strong> Bauunternehmungen<br />

Seedorffeldstrasse 21 CH-3302 Moosseedorf Tel. +41 31 388 75 75 Fax +41 31 388 75 01<br />

www.martiag.ch info@martiag.ch


Object<br />

Pumped storage plant with a forecast output power of<br />

900 MW in the border area of Switzerland and France,<br />

between <strong>Marti</strong>gny (canton Wallis) and Chamonix.<br />

The new station uses the difference in water levels between<br />

the reservoirs of Vieux Emosson (2205 metres above sea<br />

level) and Emosson (1930 metres above sea level).<br />

Description of Services<br />

– Main access tunnel L = 5600 m, excavation with a hard<br />

rock TBM (Ø 9.47 m)<br />

– Access tunnels L = 4500 m, excavation by drill & blast<br />

– Machine hall 35 × 52 × 190 m<br />

– Transformer hall 23 × 25 × 127 m<br />

– Waterway tunnel: 2 galleries L = 1500 m<br />

– Pressure shafts: 2 vertical shafts H = 480 m, excavation<br />

using the Raise Boring method and drill and blast<br />

– Shell and interior work<br />

– Gravel processing plant and concrete plant<br />

– Final disposal of the excavation material at Disposal site<br />

Le Châtelard<br />

General Conditions<br />

– complex project in high altitude (snow and avalanches<br />

in the winter)<br />

– The starting point for Logistics and Assembly is<br />

hampered due to the very restricted space conditions<br />

Executed by <strong>Marti</strong> Tunnelbau <strong>AG</strong><br />

1<br />

2<br />

Cover: Gripper Tunnel Boring Machine S-167/S-275<br />

1. TBM assembled and ready to go<br />

2. Gravel processing plant