VI RELATIONSHIP OF THE SDP TO THE RISK-INFORMED PERFORMANCE<br />

INDICATORS<br />

The <strong>NRC</strong> Reactor Oversight Process (as defined in <strong>IMC</strong> 2515) evaluates licensee<br />

performance using a combination of Performance Indicators (PIs) and inspections.<br />

Thresholds have been established for the PIs, which, if exceeded, may prompt additional<br />

<strong>NRC</strong> actions to focus both licensee and Agency’s attention on areas where there is a<br />

potential decline in licensee performance.<br />

The white-yellow and yellow-red thresholds for the initiating events and mitigating systems<br />

performance indicators were risk-informed using the same “scale” as the SDP described<br />

in this appendix. The green-white thresholds were set low enough to identify performance<br />

outliers. As a result, licensee performance is assessed by comparing and “adding” the<br />

contributions of both performance indicators and inspection findings in the Action Matrix.<br />

END<br />

Attachment 1 - User Guidance for Significance Determination of Reactor Inspection<br />

Findings for At-Power Situations<br />

Attachment 2 - Site Specific Risk-Informed Inspection Notebook Usage Rules<br />

<strong>0609</strong>, <strong>App</strong> A A-4 Issue Date: 12/01/04