- Page 1: ted to R3 282 000.00. BERGRIVIER MU
- Page 5 and 6: this IDP and budget. The effort and
- Page 7 and 8: • There will be no budget allocat
- Page 9 and 10: A summary of the proposed tariffs f
- Page 11: Table 5 Comparison between current
- Page 15 and 16: Organisational Structure Votes Orga
- Page 17 and 18: WC013 Bergrivier - Table A1 Budget
- Page 19 and 20: WC013 Bergrivier - Table A3 Budgete
- Page 21 and 22: WC013 Bergrivier - Table A5 Budgete
- Page 23 and 24: WC013 Bergrivier - Table A7 Budgete
- Page 25 and 26: WC013 Bergrivier - Table A9 Asset M
- Page 27 and 28: WC013 Bergrivier - Supporting Table
- Page 29 and 30: WC013 Bergrivier - Supporting Table
- Page 31 and 32: WC013 Bergrivier - Supporting Table
- Page 33 and 34: WC013 Bergrivier - Supporting Table
- Page 35 and 36: WC013 Bergrivier - Supporting Table
- Page 37 and 38: Services provided by 'external mech
- Page 39 and 40: Trend Change in consumer debtors (c
- Page 41 and 42: WC013 Bergrivier - Supporting Table
- Page 43 and 44: WC013 Bergrivier - Supporting Table
- Page 45 and 46: WC013 Bergrivier - Supporting Table
- Page 47 and 48: WC013 Bergrivier - Supporting Table
- Page 49 and 50: WC013 Bergrivier - Supporting Table
- Page 51 and 52: WC013 Bergrivier - Supporting Table
- Page 53 and 54: WC013 Bergrivier - Supporting Table
- Page 55 and 56: WC013 Bergrivier - Supporting Table
- Page 57 and 58: WC013 Bergrivier - Supporting Table
- Page 59 and 60: WC013 Bergrivier - Supporting Table
- Page 61 and 62: WC013 Bergrivier - Supporting Table
- Page 63 and 64:
WC013 Bergrivier - Supporting Table
- Page 65 and 66:
WC013 Bergrivier - Supporting Table
- Page 67 and 68:
WC013 Bergrivier - Supporting Table
- Page 69 and 70:
WC013 Bergrivier - Supporting Table
- Page 71 and 72:
lly 2013/14 Medium Term Revenue & E
- Page 73 and 74:
lly 2013/14 Medium Term Revenue & E
- Page 75 and 76:
WC013 Bergrivier - Supporting Table
- Page 77 and 78:
Tariewe van toepassing met ingang v
- Page 79 and 80:
Tariewe van toepassing met ingang v
- Page 81 and 82:
Tariewe van toepassing met ingang v
- Page 83 and 84:
1. WOORDOMSKRYWINGS 2. DOELWITTE 3.
- Page 85 and 86:
(vii) Hoof-Finansiële Beampte bete
- Page 87 and 88:
4.3 Elke senior bestuurder van die
- Page 89 and 90:
(d) Direk toeskryfbare koste om die
- Page 91 and 92:
7.6 Wanneer vaste bates verkoop wor
- Page 93 and 94:
BERGRIVIER MUNISIPALITEIT KONTANTBE
- Page 95 and 96:
Weergawe: Konsep Datum: 24 Februari
- Page 97 and 98:
met soveel oordeel en sorg, onder h
- Page 99 and 100:
Die Munisipale Bestuurder mag die p
- Page 101 and 102:
• Of die bogenoemde netto balans
- Page 103 and 104:
eleggings verkry word, maar ‘n ho
- Page 105 and 106:
8.12 Verslagdoening Die Munisipale
- Page 107 and 108:
INHOUDSOPGAWE HOOFSTUK 1 Bladsy 1.
- Page 109 and 110:
INLEIDING Ingevolge artikel 96 van
- Page 111 and 112:
“Munisipaliteit” die Munisipali
- Page 113 and 114:
2.1.2 Ander metodes van kommunikasi
- Page 115 and 116:
2.5.2 Die Munisipaliteit kan enige
- Page 117 and 118:
sal hy of sy bewus gemaak word van
- Page 119 and 120:
5.5 Waar die laaste datum vir betal
- Page 121 and 122:
onmiddellik oorgegaan sal word om e
- Page 123 and 124:
9.2 ‘n Deposito soos in paragraaf
- Page 125 and 126:
11. KOSTE VAN INVORDERING HOOFSTUK
- Page 127 and 128:
Enige bestelling, kennisgewing of a
- Page 129 and 130:
22.1 ‘n Aansoek ontvang ooreenkom
- Page 131 and 132:
(2) in die geval vermeld in paragra
- Page 133 and 134:
INDEX PREAMBLE 3 1. OBJECTIVE 3 2.
- Page 135 and 136:
• there is a need to provide loca
- Page 137 and 138:
“exemption” in relation to the
- Page 139 and 140:
“Municipal Systems Act” means t
- Page 141 and 142:
“public service infrastructure”
- Page 143 and 144:
Rates will be based on the value of
- Page 145 and 146:
(i) acquired through Provision of L
- Page 147 and 148:
Where there is no agreement, the mu
- Page 149 and 150:
Refer to credit control policy (6)
- Page 151 and 152:
a. occupy the property as his/her n
- Page 153 and 154:
Rateable property registered in the
- Page 155 and 156:
13.3 REDUCTIONS Categories of prope
- Page 157 and 158:
19. CORRECTION OF ERRORS AND OMISSI
- Page 159 and 160:
I N H O U D S O P G A W E DEEL 1: A
- Page 161 and 162:
(Let wel: Belastings word eksklusie
- Page 163 and 164:
3.1.6.1 kostes gehef deur ander dep
- Page 165 and 166:
DEEL 5 WATER 5.1 Die kategorieë va
- Page 167 and 168:
DEEL 8 ANDER TARIEWE 8.1 Ander tari
- Page 169 and 170:
DEEL 9: BESKIKBAARHEIDSFOOIE 9.1 Be
- Page 171 and 172:
1 INTRODUCTION VIREMENT POLICY Appr
- Page 173 and 174:
3.6 Director 3.7 Financial Year 3.8
- Page 175 and 176:
5 VIREMENT REQUIREMENTS “(1) The
- Page 177 and 178:
VIREMENT APPLICATION FORM z:\begroo
- Page 179 and 180:
1. PREAMBLE (1) Section 229(1) of t
- Page 181 and 182:
BERGRIVIER MUNISIPALITEIT VOORSIENI
- Page 183 and 184:
12. Reeks verkrygingsprosesse 13. A
- Page 185 and 186:
(a) Die Wet op die Raamwerk vir Voo
- Page 187 and 188:
HOOFSTUK 1 IMPLEMENTERING VAN VOORS
- Page 189 and 190:
(b) enige afwyking van die modelbel
- Page 191 and 192:
(3) die bodtoekenningskomitee aan w
- Page 193 and 194:
RAAMWERK VIR VOORSIENINGSKANAAL BES
- Page 195 and 196:
12. (1) Goedere en dienste mag sleg
- Page 197 and 198:
(b) ten minste, eenkeer per jaar de
- Page 199 and 200:
Formele geskrewe pryskwotasies (art
- Page 201 and 202:
Proses vir mededingende botte 20. D
- Page 203 and 204:
Publieke uitnodiging vir mededingen
- Page 205 and 206:
Twee-fase bodproses 25. (1) ‘n Tw
- Page 207 and 208:
(g) moet goedgekeur wees deur die r
- Page 209 and 210:
(4) geen lid van die bodevaluerings
- Page 211 and 212:
(a) die staatsliggaam die kontrak v
- Page 213 and 214:
(ii) indien sodanige goedere of die
- Page 215 and 216:
aanbevelings, voorlê aan die Oudit
- Page 217 and 218:
(a) Die monitering van spandeerpatr
- Page 219 and 220:
Prestasiebestuur 42. Die rekenpligt
- Page 221 and 222:
(ii) enige ander rolspeler betrokke
- Page 223 and 224:
(a) ‘n Limiet ten opsigte van die
- Page 225 and 226:
(d) moet besonderhede van enige bel
- Page 227:
6.2 Bod evaluering / toekenning kom