South Africa – hourly <strong>cost</strong> of labour (including overheads)<br />

South Africa – major projects<br />

ZAR<br />

Medupi Power Station 125bn<br />

Kusile Power Station 141bn<br />

RMI Integrated Titanium and Zirconium Beneficiation Complex 15bn<br />

Xstrata Tweefontein Optimisation Project 8bn<br />

Xstrata Atcom East 3.8bn<br />

Pascoulama 5bn<br />

2010 2011 2011<br />

ZAR ZAR USD<br />

Group 1 tradesman – eg plumber, electrician 50 52 7<br />

Group 2 tradesman – eg carpenter, bricklayer 45 48 7<br />

Group 3 tradesman – eg carpet layer, tiler, plasterer 35 40 6<br />

General labourer 15 18 3<br />

Site foreman 200 200 28<br />

South Africa – <strong>cost</strong>s of materials<br />

Concrete 30 mpa (m 3 ) (1,500m 3 job) 940 834 117<br />

Reinforcement bar 16mm (tonne) (120 tonne job) 7,727 8,100 1,141<br />

Concrete block (400 x 200) per 1,000 (>10,000 block job) 1,450 2,000 282<br />

Standard brick per 1,000 1,500 1,600 225<br />

Structural steel beams (tonne) (>100 tonne job) 15,000 20,000 2,816<br />

Glass pane 6mm (m 2 ) 400 400 56<br />

Softwood timber for framing 100mm x 50mm (m) 70 70 10<br />

Plasterboard 13mm (m 2 ) 46 46 6<br />

Emulsion paint (litre) 40 37 5<br />

Copper pipe 15mm (m) (>1,000m job) 30 35 5<br />

Copper cable (m) (3C + E, 2.5mm PVC) (>100,000m job) – – –<br />

South Africa – key trades (excluding preliminaries and builders’ margins)<br />

Excavate basement (m 3 ) (1,800m 3 job) 50 60 8<br />

Excavate footings (m) 60 78 11<br />

Concrete in slab (m 3 ) (1,500m 3 job) 1,085 917 129<br />

Reinforcement in beams (tonne) 7,727 8,910 1,255<br />

Formwork to soffit of slab (m 2 ) 135 126 18<br />

Blockwork in wall (m 2 ) (10,000 block job) 210 210 30<br />

Structural steel beams (tonne) 24,000 24,500 3,450<br />

Pre-cast concrete wall (m 2 ) 450 460 65<br />

Curtain wall glazing incl support system (m 2 ) (1,000m 2 job) 1,600 2,100 296<br />

Plasterboard 13mm thick to stud wall (m 2 ) (3,000m 2 job) 200 540 76<br />

Single solid core door incl frame and hardware (no) (50 door job) 1,683 1,600 225<br />

Painting to walls primer + 2 coats (m 2 ) 27 27 4<br />

Ceramic tiling (m 2 ) (1,000m 2 job) 200 200 28<br />

Vinyl flooring to wet areas (m 2 ) (500m 2 job) 154 160 23<br />

Carpet medium tufted (m 2 ) (4,500m 2 job) 220 220 31<br />

Lighting installation (m 2 ) (>5,000m 2 job) – 85 12<br />

Copper pipe 15mm to wall (m) (>1,000m job) 55 40 6<br />

Fire sprinklers (per m 2 ) (5,000m 2 job) 165 260 37<br />

Air conditioning incl main plant (m 2 ) (>5,000m 2 job) 1,300 1,300 183<br />

making the difference 29<br />

This document is in the public domain and is shared here by RSS Construction Projects Ltd - www.rssprojects.com

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!