UK – hourly <strong>cost</strong> of labour (including overheads)<br />

UK – major projects<br />

GBP<br />

Crossrail 14.5bn<br />

High Speed Railway 2 32.7bn<br />

London <strong>2012</strong> Olympics 2bn<br />

London Tideway Improvements 4bn<br />

Forth Replacement Crossing 1bn<br />

2010 2011 2011<br />

GBP GBP USD<br />

Group 1 tradesman – eg plumber, electrician 30 30 48<br />

Group 2 tradesman – eg carpenter, bricklayer 30 30 48<br />

Group 3 tradesman – eg carpet layer, tiler, plasterer 30 30 48<br />

General labourer 18 18 29<br />

Site foreman 45 46 74<br />

UK – <strong>cost</strong>s of materials<br />

Concrete 30 mpa (m 3 ) (1,500m 3 job) 85 83 133<br />

Reinforcement bar 16mm (tonne) (120 tonne job) 700 744 1,193<br />

Concrete block (400 x 200) per 1,000 (>10,000 block job) 1,050 1,071 1,717<br />

Standard brick per 1,000 450 454 728<br />

Structural steel beams (tonne) (>100 tonne job) 1,600 1,786 2,864<br />

Glass pane 6mm (m 2 ) 30 31 50<br />

Softwood timber for framing 100mm x 50mm (m) 2 2 3<br />

Plasterboard 13mm (m 2 ) 5 5 8<br />

Emulsion paint (litre) 2 2 3<br />

Copper pipe 15mm (m) (>1,000m job) 1 1 2<br />

Copper cable (m) (3C + E, 2.5mm PVC) (>100,000m job) 0.15 0.15 0.24<br />

UK – key trades (excluding preliminaries and builders’ margins)<br />

Excavate basement (m 3 ) (1,800m 3 job) 45 43 69<br />

Excavate footings (m) 12 12 19<br />

Concrete in slab (m 3 ) (1,500m 3 job) 110 107 172<br />

Reinforcement in beams (tonne) 950 1,010 1,619<br />

Formwork to soffit of slab (m 2 ) 42 36 58<br />

Blockwork in wall (m 2 ) (10,000 block job) 35 36 58<br />

Structural steel beams (tonne) 1,900 2,120 3,399<br />

Pre-cast concrete wall (m 2 ) 50 63 101<br />

Curtain wall glazing incl support system (m 2 ) (1,000m 2 job) 550 570 914<br />

Plasterboard 13mm thick to stud wall (m 2 ) (3,000m 2 job) 18 19 30<br />

Single solid core door incl frame and hardware (no) (50 door job) 750 720 1,154<br />

Painting to walls primer + 2 coats (m 2 ) 5 5 8<br />

Ceramic tiling (m 2 ) (1,000m 2 job) 40 41 66<br />

Vinyl flooring to wet areas (m 2 ) (500m 2 job) 25 24 38<br />

Carpet medium tufted (m 2 ) (4,500m 2 job) 25 24 38<br />

Lighting installation (m 2 ) (>5,000m 2 job) 65 67 107<br />

Copper pipe 15mm to wall (m) (>1,000m job) 10 10 16<br />

Fire sprinklers (per m 2 ) (5,000m 2 job) 30 31 50<br />

Air conditioning incl main plant (m 2 ) (>5,000m 2 job) 160 166 266<br />

making the difference 35<br />