03.06.2013 Views

Registration document 2007 - Total.com

Registration document 2007 - Total.com

Registration document 2007 - Total.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

2<br />

Asia/Far East – Pacific<br />

In 2006, TOTAL’s production in Asia/Far East, principally<br />

from Indonesia, amounted to 253 kboe/d, <strong>com</strong>pared to 248<br />

kboe/d in 2005 and 245 kboe/d in 2004, an increase of 2%<br />

over the period. Asia/Far East represented 11% of the<br />

Group’s overall production for the year 2006. Highlights for<br />

the 2004 to 2006 period included the acquisition of interests<br />

in several exploration permits in Australia, Bangladesh and<br />

Indonesia, the acquisition of a 24% interest in the Ichthys<br />

LNG project in Australia in partnership with INPEX, and the<br />

signature of an agreement with China National Petroleum<br />

Corporation for the appraisal, development and production<br />

of natural gas on the Sulige South block in China.<br />

Australia<br />

After acquiring interests in two blocks (WA-297P, WA-269P) early<br />

in 2005, in 2006 TOTAL increased its offshore interests in both<br />

exploration and development of previously discovered fields in<br />

northwest Australia.<br />

In February 2006 with the same partners as for Block WA-269P<br />

(30%), TOTAL acquired a 30% share in the two adjacent blocks,<br />

WA-369P and WA-370P, located in the Carnarvon basin near the<br />

Pluto field. A 3D seismic campaign on these blocks was<br />

<strong>com</strong>pleted in 2006 and four wells are scheduled to be drilled in<br />

<strong>2007</strong> and 2008.<br />

Also in 2006, TOTAL acquired a 25% share in adjacent blocks,<br />

WA-301P, WA-303P, WA-304P, and WA-305P, located in the<br />

Browse basin. A well is scheduled to be drilled on Block WA-303P<br />

in <strong>2007</strong>.<br />

In addition, in August 2006 TOTAL acquired a 24% interest in<br />

Block WA-285P, also in the Browse basin. The Ichthys gas and<br />

condensates field, in the same basin, has already had six<br />

successful wells drilled since 2000. This field is expected to be<br />

developed to produce an estimated 6 Mt/y to 10 Mt/y of LNG,<br />

condensates and liquefied petroleum gas (LPG). In 2006, this<br />

project received the Major Project Facilitation Status, which<br />

should contribute to obtaining governmental approvals, expected<br />

in 2008. The environmental evaluation of the development<br />

scheme was launched in May 2006, and exploration and<br />

appraisal drilling are planned for <strong>2007</strong>.<br />

In January <strong>2007</strong>, TOTAL acquired an 80% interest, as operator,<br />

for the lower levels of Block AC/P-37. A seismic campaign is<br />

scheduled for <strong>2007</strong>.<br />

Bangladesh<br />

Late in 2005, TOTAL signed an agreement to acquire 60% of two<br />

offshore exploration blocks, 17 and 18, located southeast of<br />

Bangladesh. The government approved this agreement on<br />

March 14, <strong>2007</strong>.<br />

(1) Source : Wood MacKenzie, Deutsche Bank.<br />

28<br />

Business overview<br />

Upstream - Exploration & Production<br />

TOTAL – <strong>Registration</strong> Document 2006<br />

Brunei<br />

TOTAL is the operator of the Maharaja Lela Jamalulalam field,<br />

located offshore on Block B of Brunei Darussalam (37.5%,<br />

operator). The Group’s share of production amounted to<br />

15 kboe/d in 2006, <strong>com</strong>pared to 13 kboe/d in 2005 and<br />

14 kboe/d in 2004. After <strong>com</strong>pleting studies in 2006, TOTAL is<br />

planning to drill several exploration wells on this block in <strong>2007</strong>.<br />

TOTAL is also the operator of deep-offshore exploration Block J<br />

(60%), for which a production sharing contract was signed in<br />

March 2003. Exploration operations on the 5,000 km 2 block have<br />

been suspended since May 2003 due to a border dispute with<br />

Malaysia.<br />

China<br />

Early in 2006, TOTAL and China National Petroleum Corporation<br />

signed a production sharing contract for the appraisal,<br />

development, and production of natural gas resources on<br />

the South Sulige block covering an area of approximately<br />

2,390 km2 in the Ordos Basin in the Inner Mongolia province.<br />

The agreement was approved by the Chinese authorities and<br />

became effective in May 2006. The appraisal work outlined in<br />

the contract (seismic acquisition, well testing) began in<br />

September 2006.<br />

Indonesia<br />

TOTAL has been present in Indonesia since 1968. Indonesia<br />

represented 8% of the Group’s production in 2006, amounting to<br />

182 kboe/d, the same level as in 2005, <strong>com</strong>pared to 177 kboe/d<br />

in 2004. TOTAL operates two offshore blocks in the East<br />

Kalimantan zone, the Mahakam permit (50%, operator), and the<br />

Tengah permit (22.5%).<br />

TOTAL’s operations in Indonesia are primarily concentrated on the<br />

Mahakam permit, which covers several fields including Peciko and<br />

Tunu, the largest gas fields in the East Kalimantan zone.<br />

TOTAL delivers its natural gas production to PT Badak, the<br />

Indonesian <strong>com</strong>pany that operates the Bontang LNG plant. The<br />

overall capacity of the eight liquefaction trains of the Bontang<br />

plant is 22 Mt/y, one of the largest in the world (1) . The LNG<br />

produced is primarily sold under long-term contracts with<br />

Japanese, South Korean and Taiwanese purchasers that mainly<br />

use it for power generation. In 2006, the production operated by<br />

TOTAL on the Mahakam permit amounted to 2,648 Mcf/d, and<br />

the gas delivered by TOTAL to Bontang accounted for more than<br />

70% of the plant’s supply.<br />

In 2006, TOTAL acquired a 49% share in the offshore East<br />

Sepanjang block, located northeast of the island of Java. A<br />

seismic acquisition campaign is scheduled and an exploration<br />

well is expected to be drilled. Pursuant to a call for tenders<br />

launched by the Indonesian Ministry of Mines and Energy in<br />

2006, early in <strong>2007</strong> TOTAL was awarded the South East<br />

Mahakam exploration block (50%, operator), located in the<br />

Mahakam delta.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!