CONSTRUCŢII <strong>SUB</strong>TERANE<br />

Fig. 3 Diagramă batere ţevi, baterea primei ţevi şi situaţia<br />

finală<br />

Se demolează parţial timpanul pentru a putea continua baterea<br />

ţevilor 17' – 8 'si 8 – 17;<br />

• Se execută sapatura la cotele din proiect şi se toarnă betonul<br />

de egalizare 15 cm grosime , între fundaşiile podeţului<br />

existent;<br />

Etapa 2.- Execuţia radierului tronsonului de capăt ( timpan)<br />

L= 2, 00 m<br />

• Se demolează structura existenta pe 2,50 m şi se sprijină<br />

provizoriu bolta existentă în front cu cintre metalice;<br />

Fig. 4 Execuţie radier tronson de capăt<br />

• Se execută sapatura la cotele din proiect pentru execuţia<br />

radierului pe 2,00 m;<br />

• Se montează cintrul metalic aferent următorului tronson;<br />

• Se completează betonul de egalizare de 15 cm grosime;<br />

• Se armează, se cofrează şi se betonează radierul;<br />

Etapa 3 – Execuţia elevaţiei tronsonului de capat L= 2,00 m<br />

şi a primului tronson de radier al inelului 1, L = 3,00 m<br />

• Se montează armatura, se cofrează şi se betonează elevaţia<br />

tronsonului de capăt ( timpan);<br />

• Se execută hidroizolaţia la extradosul tronsonului de capat;<br />

• Se demolează structura existentă pe 3,50 m şi se sprijină<br />

provizoriu bolta în front cu cintre demontabile;<br />

• Se execută săpatura la cotele din proiect pentru realizarea<br />

radierului pe 3,00 m;<br />

• Se montează cintrele metalice pierdute la intradosul ţevilor;<br />

UNDERGROUND CONSTRUCTIONS<br />

Figure 3 Pipe jacking diagram, first pipejacking and final<br />

situation<br />

• existing tympan is partially demolished in order to continue<br />

the driving of pipes no17’-8-17<br />

• the excavation is performed based on the blueprint, a 15 cm<br />

layer of levelling concrete is poured in between the<br />

foundations of the existing culvert;<br />

Stage 2. Construction of the 2 m end section element<br />

• existing structure is demolished on a 2.50 m length and the<br />

existing arch is temporarily supported by steel frameworks<br />

Figure 4 Construction of end section invert<br />

• A 2 m-long excavation is performed based on the blueprint<br />

in order to construct the invert<br />

• steel framework is installed, to be used for next section;<br />

• the levelling concrete is completed up to a 15 cm width;<br />

• invert is reinforced, encased and concreted.<br />

Stage 3 – Construction of the end section elevation L = 2.00<br />

m and the first invert section of the ring 1 L = 3.00 m<br />

• reinforcement and encasement are performed, then the end<br />

section element elevation is concreted;<br />

• waterproofing is performed at the end section back arch;<br />

• existing structure is demolished on a 3.50 m length and the<br />

existing arch is supported by removable frame steelworks<br />

• excavation is performed based on blueprint in order to<br />

construct the invert on a 3 m length<br />

• frame steelworks are put in place at the pipes’ intrados<br />

Număr Special 2005<br />

Special Issue 32