CONSTRUCŢII <strong>SUB</strong>TERANE<br />

• Se montează tolele metalice sudate de cintre;<br />

• Se completeză betonul de egalizare de 15 cm;<br />

• Se realizează rostul total cu 2 foi de carton bitumat, între<br />

tronsonul de capat si cel curent;<br />

• Se execută hidroizolaţia şi se petrece cu cea din etapa<br />

anterioară;<br />

• Se armează, se cofrează şi se betonează radierul pe 3,00 m;<br />

Fig.5 Armare timpan şi cofraj metalic mobil pentru betonare<br />

Etapa 4 – Execuţia primului tronson de boltă L = 2,00 m şi a<br />

celui de al doilea tronson de radier cu L = 3,00 m<br />

• Se armează, se cofrează şi se betonează primul tronson de<br />

bolta de 2,00 m;<br />

• Se demolează structura existentă pe 3,5 m şi se sprijină<br />

provizoriu bolta existentă în front , cu cintre demontabile;<br />

Se execută săpatura la cotele din proiect pentru realizarea<br />

radierului L= 3,00m;<br />

Fig.6 Faze de execuţie ine1 şi imagine montare cintre.<br />

• Se montează cintrele metalice pierdute la intradosul ţevilor;<br />

• Se montează tolele metalice sudate de cintre pe tronsonul<br />

pe care s-a betonat radierul;<br />

• Se execută hidroizolaţia şi se petrece cu cea executată în<br />

etapa anterioară;<br />

• Se completează betonul de egalizare de 15 cm grosime;<br />

• Se armează, se cofrează şi se betonează radierul pe o<br />

UNDERGROUND CONSTRUCTIONS<br />

• end plates are welded in between the frame steelworks<br />

• the levelling concrete is completed up to a 15 cm width<br />

• the total joint is made using 2 asphalt board sheets, between<br />

the end section and the current section.<br />

• waterproofing is performed and meets the one performed<br />

during the previous stage.<br />

• invert section 1 of the next ring is reinforced, cased and<br />

concreted on a 3 m length.<br />

Fig.5. Reinforcement of the tympan and mobile metallic casing<br />

for concreting.<br />

Stage 4-Construction of the first arch section, L=2m, and<br />

the second invert section, L=3.00m.<br />

• reinforcement and encasement are performed, then the first<br />

arch section is concreted;<br />

• existing structure is demolished on a 3.50 m length and the<br />

existing arch is temporarily supported by removable frame<br />

steelworks.<br />

An excavation is performed based on the blueprint in order to<br />

construct the invert on a 3.0 m length<br />

Fig. 6 Stages of construction of the ring 1 and installing of<br />

frame steelworks<br />

• frame steelworks are put in place at the pipes’ intrados<br />

• metallic end plates welded on frame steelworks are<br />

installed in the section where the invert was concreted<br />

• waterproofing is performed and meets the one performed<br />

during the previous stage<br />

• the levelling concrete is completed up to a 15 cm thickness;<br />

• invert is reinforced, encased and concreted on a 3.00<br />

Număr Special 2005<br />

Special Issue 33