Download Entire Catalog - Cooper Industries
Download Entire Catalog - Cooper Industries
Download Entire Catalog - Cooper Industries
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Step 2: Project Questionnaire<br />
After engineering drawings have been received and reviewed, a Project<br />
Questionnaire spreadsheet (listed below) will be sent out to gather<br />
specific information that is needed for your Total Ruff-IN quotation.<br />
Job Name: . . . . . . . . . . . . . . . . . .<br />
Ruff-IN Project Questionnaire<br />
Purpose of quotation: . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Bid Buy<br />
Can branches be routed through ceiling? . . . . . . . . . . . . . . . . . . . . . . . . Yes No<br />
Contact Person(s) . . . . . . . . . . . .<br />
Phone# . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .<br />
Projected date for product needed on jobsite: . . . . . . . . . . .<br />
Interior Wall Depths (2 1 /2”, 3 1 /2”, 4”, 6”, other) . . . . . . . . . . . . .<br />
Ceiling Height (9’-0”, 9’-6”, 10’-0”, other) . . . . . . . . . . . . . . . . .<br />
MC Cable Type (standard, hospital, all-purpose) . . . . . . . . . . . .<br />
MC Cable . . . . . . . No Whips Whips attached to assembly Whips shipped separate<br />
Plaster Ring Depth(s): . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .<br />
Bracket(s) for device w/wall height below 24” . . . . . . . . . . . .<br />
Exact device height . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .<br />
Bracket(s) for device w/wall height above 24” . . . . . . . . . . . .<br />
Box Size (furnished with 2 1 /2” deep boxes) . . . . . . . . . . . . . . . . . . . . .4” square 5” square<br />
Internal connector (wago, wire nut, other) . . . . . . . . . . . . . . . .<br />
Circuits can or cannot share neutral wires? . . . . . . . . . . . .<br />
Device Style(s) (Standard, Decorative) . . . . . . . . . . . . . . . . . . .<br />
Device Grade (Construction, Commercial, Industrial, Hospital) .<br />
Device Orientation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Ground Up Ground Down<br />
Device Color (Ivory, White, Light Almond, Almond, other) . . . . .<br />
Standard Takeoff includes provisions for receptacles, switches, GFCI, and data boxes.<br />
What other applications should be included in the quote?<br />
Does drawing include proper scale and reference? . . . . . . . . . . . . . . . . Yes No<br />
Include Special Instructions Below:<br />
Step 2 - Project Questionnaire<br />
* An electronic copy of the Ruff-IN Project Questionnaire is available @ www.cooperbline.com/Ruff-IN<br />
33<br />
Ruff-IN MC Cable Solutions