HOME DEVELOPMENT MUTUAL FUND LUCENA ... - Pag-ibig Fund
HOME DEVELOPMENT MUTUAL FUND LUCENA ... - Pag-ibig Fund
HOME DEVELOPMENT MUTUAL FUND LUCENA ... - Pag-ibig Fund
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
a- May not be required for small procurement (i.e., procurement of goods costing PhP 2M and below).<br />
b- Advertisement of the ITB in a newspaper of general nationwide circulation shall not be required for contracts to be bid with an ABC of PhP 2M and below.<br />
c- The BAC shall convene at least 1 Pre-Bid Conference for contracts to be bid with an ABC of PhP 1M or more. However, for contracts to be bid with an<br />
ABC of less than PhP 1M, Pre-Bid Conference maybe conducted at the discretion of the BAC.<br />
d- Shall be completed in not more than 7CD from the determination of the LCB but maybe extended by the HOPE up to maximum of 30CD.<br />
e- Board approval shall be required prior to contract signing for contracts amounting to more than PhP 40M.<br />
Note: Prescribed timeline for Goods and Services - maximum of 124 CD per Annex<br />
"C" of the Revised IRR of R.A. 9184<br />
GS FORM 10