Diabolo Rail Project,<br />
Brussels Airport,<br />
Belgium<br />
Brussels Airport<br />
New high‐speed<br />
railway line from<br />
Brussels to Antwerp<br />
South connection<br />
to Brussels<br />
Evacuation tunnel<br />
North connection<br />
to Antwerp<br />
To encourage the future development of Brussels-<br />
Zaventem as a business location, two infrastructure<br />
projects have been initiated to enable<br />
access to Zaventem international airport from the<br />
north. This will add to the airport' s attractiveness<br />
for passenger and goods traffic.<br />
On the one hand, the Diabolo Rail Project<br />
comprises the conversion of the existing dead-end<br />
station at Zaventem international airport into a<br />
through station and its connection to the new<br />
high-speed railway line from Brussels to Antwerp,<br />
which will be built in between the dual<br />
carriageways of the E19 motorway.<br />
Evacuation<br />
shaft<br />
Bored tunnels<br />
On the other hand, the accessibility of Brucargo<br />
freight airport will be improved by the<br />
construction of additional entrance and slip roads<br />
for the Cargo motorway bridge and the<br />
construction of a new cyclist bridge, and a fly-over<br />
enabling direct access to the Cargo area.<br />
The core of the Diabolo Rail Project are two<br />
machine-driven tunnels, each approx. 1,070 m in<br />
length, driven under aircraft parking stands, the<br />
most important runway of the airport and some<br />
taxiways. A slurry-supported Mixshield TBM was<br />
used to bore these two tunnels.<br />
Slurry Mode
General Data<br />
Client / Owner: Northern Diabolo nv (spc for railway part)<br />
Via-Zaventem nv (spc for road part)<br />
Infrabel (railway part)<br />
Flemish Government, Administratie Wegen & Verkeer (road part)<br />
Contractor: THV Dialink - a Joint Venture of CEI-De Meyer,<br />
<strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong>, MBG, Vinci Construction<br />
Grands Projets and Smet-Tunnelling<br />
Design: Basic design: TucRail and Eurostation<br />
Final design: - Bored tunnel: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> - Techn. Dept.<br />
- Civil works: Technum<br />
Construction Time: 2007 - 2012<br />
Contract Value: € 322 million<br />
Contract Type: Fixed price (lump sum)<br />
Technical Data, Tunnel<br />
Type of tunnel: Two single-track underground<br />
railway tunnels<br />
Length of tunnel: 2 x 1,070 m<br />
Inner diameter: 7.30 m<br />
Outer diameter: 8.00 m<br />
Min. radius: 600 m<br />
Min. cover: 10 m<br />
Max. cover: 13 m<br />
Segment Design<br />
Number of rings: 1,428 nos.<br />
Ring split: 7 +1 keystone<br />
Segment width: 1.50 m<br />
Segment thickness: 0.35 m<br />
<strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong><br />
Tunnelling Division<br />
Eschborner Landstraße 130-132<br />
D- 60489 Frankfurt am Main<br />
TBM<br />
TBM manufacturer: Herrenknecht<br />
Type: Slurry shield<br />
Diameter: 8.27 m<br />
Length of TBM: 70 m (incl. backup)<br />
Total weight of TBM: 876 t<br />
Weight TBM/Backup: 451/425 t<br />
Thrust cylinders: 2 x 14 nos.<br />
Thrust force: 48,285 kN<br />
Rotation speed: 0 - 2.13 rpm<br />
Max. torque: 3,950 kNm<br />
Max. operating pressure: 3.0 bar<br />
Installed electr. power: 2,000 kW<br />
Logistics: Rail transport<br />
Material handling: Slurry circuit<br />
(2,100 m³/h)<br />
Geology<br />
Geotechnical features: Brussels Sands (Quaternary sands with sandstone layers)<br />
Max. hydrostatic pressure: 1.3 bar<br />