Diabolo Rail Project,<br />

Brussels Airport,<br />

Belgium<br />

Brussels Airport<br />

New high‐speed<br />

railway line from<br />

Brussels to Antwerp<br />

South connection<br />

to Brussels<br />

Evacuation tunnel<br />

North connection<br />

to Antwerp<br />

To encourage the future development of Brussels-<br />

Zaventem as a business location, two infrastructure<br />

projects have been initiated to enable<br />

access to Zaventem international airport from the<br />

north. This will add to the airport' s attractiveness<br />

for passenger and goods traffic.<br />

On the one hand, the Diabolo Rail Project<br />

comprises the conversion of the existing dead-end<br />

station at Zaventem international airport into a<br />

through station and its connection to the new<br />

high-speed railway line from Brussels to Antwerp,<br />

which will be built in between the dual<br />

carriageways of the E19 motorway.<br />

Evacuation<br />

shaft<br />

Bored tunnels<br />

On the other hand, the accessibility of Brucargo<br />

freight airport will be improved by the<br />

construction of additional entrance and slip roads<br />

for the Cargo motorway bridge and the<br />

construction of a new cyclist bridge, and a fly-over<br />

enabling direct access to the Cargo area.<br />

The core of the Diabolo Rail Project are two<br />

machine-driven tunnels, each approx. 1,070 m in<br />

length, driven under aircraft parking stands, the<br />

most important runway of the airport and some<br />

taxiways. A slurry-supported Mixshield TBM was<br />

used to bore these two tunnels.<br />

Slurry Mode


General Data<br />

Client / Owner: Northern Diabolo nv (spc for railway part)<br />

Via-Zaventem nv (spc for road part)<br />

Infrabel (railway part)<br />

Flemish Government, Administratie Wegen & Verkeer (road part)<br />

Contractor: THV Dialink - a Joint Venture of CEI-De Meyer,<br />

<strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong>, MBG, Vinci Construction<br />

Grands Projets and Smet-Tunnelling<br />

Design: Basic design: TucRail and Eurostation<br />

Final design: - Bored tunnel: <strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong> - Techn. Dept.<br />

- Civil works: Technum<br />

Construction Time: 2007 - 2012<br />

Contract Value: € 322 million<br />

Contract Type: Fixed price (lump sum)<br />

Technical Data, Tunnel<br />

Type of tunnel: Two single-track underground<br />

railway tunnels<br />

Length of tunnel: 2 x 1,070 m<br />

Inner diameter: 7.30 m<br />

Outer diameter: 8.00 m<br />

Min. radius: 600 m<br />

Min. cover: 10 m<br />

Max. cover: 13 m<br />

Segment Design<br />

Number of rings: 1,428 nos.<br />

Ring split: 7 +1 keystone<br />

Segment width: 1.50 m<br />

Segment thickness: 0.35 m<br />

<strong>Wayss</strong> & <strong>Freytag</strong> <strong>Ingenieurbau</strong> <strong>AG</strong><br />

Tunnelling Division<br />

Eschborner Landstraße 130-132<br />

D- 60489 Frankfurt am Main<br />

TBM<br />

TBM manufacturer: Herrenknecht<br />

Type: Slurry shield<br />

Diameter: 8.27 m<br />

Length of TBM: 70 m (incl. backup)<br />

Total weight of TBM: 876 t<br />

Weight TBM/Backup: 451/425 t<br />

Thrust cylinders: 2 x 14 nos.<br />

Thrust force: 48,285 kN<br />

Rotation speed: 0 - 2.13 rpm<br />

Max. torque: 3,950 kNm<br />

Max. operating pressure: 3.0 bar<br />

Installed electr. power: 2,000 kW<br />

Logistics: Rail transport<br />

Material handling: Slurry circuit<br />

(2,100 m³/h)<br />

Geology<br />

Geotechnical features: Brussels Sands (Quaternary sands with sandstone layers)<br />

Max. hydrostatic pressure: 1.3 bar<br />

Phone: +49 (0)69 7929400<br />

Fax: +49 (0)69 7929491<br />

tunnelbau@wf-ib.de<br />

www.wf-ingbau.de

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!