Coal Fired Power Plant Operations - DTI Home Page
Coal Fired Power Plant Operations - DTI Home Page
Coal Fired Power Plant Operations - DTI Home Page
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
13 PT/03/BD1076/R Revision 2<br />
techniques. Since this model has not been used as an optimiser within the current project,<br />
the obvious conflict between the ESP and GNOCIS boiler recommendation for the excess<br />
oxygen has not been resolved. The excess oxygen is an important parameter in both<br />
models and thus it is not obvious that the conflict can be removed by omitting a<br />
recommendation for the parameter from one of the models.<br />
E.ON UK is currently developing an ESP optimisation model under <strong>DTI</strong> Project P330.<br />
This model will not require a coal analysis as input but will use readily available plant and<br />
ESP data to optimise the performance of the ESP in terms of flue gas additive, power and<br />
opacity.