Refinement and analysis of concept
Refinement and analysis of concept
Refinement and analysis of concept
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
• What is first cost<br />
First cost<br />
航空宇航学院<br />
– The sum <strong>of</strong> the actual cost <strong>of</strong> making the aircraft <strong>and</strong> the<br />
share <strong>of</strong> the development costs allocated to it.<br />
• First cost is difficult to be predicted at the aircraft<br />
<strong>concept</strong>ual design<br />
– Simple cost models are usually based on aircraft volume<br />
<strong>and</strong>/or mass <strong>and</strong> derived empirically from past experience.<br />
– First cost is not a very suitable criterion for project<br />
optimization.<br />
Aircraft Conceptual Design