Distribution: Larrie Easterly<br />
Auxiliaries and Activities Business Center<br />
Larrie Easterly Manager, <strong>University</strong> Engineering<br />
Jennifer<br />
Alex Leziy-Miller<br />
Johnathan Rosa<br />
Design Team<br />
James Meyer Opsis - PIC<br />
John Shorb Opsis – Project Architect, SEC<br />
Jennie Cambier Opsis – Project Architect, MU<br />
Jeri Tess Opsis – Interior Designer<br />
Meagan Ekerson Opsis – Interior Designer<br />
SEC and MU DD Meeting Notes #5<br />
August 29, 2012<br />
Page 2 of 8<br />
This represents our understanding of the discussions and conversations during the Meeting. Revisions by participants should<br />
be communicated to opsis architecture LLP.<br />
Overview<br />
The purpose of the meeting was to conduct a Sustainability Workshop and review the shared building<br />
common areas including Kitchenettes, Meditation Room, Lactation Room, and Conference Rooms,<br />
DD/LGBT, AABC, Craft Center, MU North Porch, and Cultural Kitchen.<br />
General Notes<br />
Pre-Meeting<br />
1.1 Stormwater infiltration LEED credit discussion: B&H needs additional information in order to<br />
do calcs. Opsis to confirm with B&H. L.E. stressed that you can’t infiltrate into clay soil. OSU<br />
already has a stormwater system in place.<br />
1.2 HRC update: revisions to the site plan were outlined by L.E. WM to update and provide new<br />
site plan (Update: updated drawing provided to L.E. 8/24)<br />
1.3 HRC date to be confirmed by L.E. (update: confirmed date is 10/9)<br />
1.4 MU Accessibility Workshop update: the workshop has been scheduled for 10/1. L.E. said not<br />
to reference SZS report, which is a draft report. Opsis will review report and prepare list for<br />
L.E. to review.<br />
1.5 SEC Exterior Elevations update – elevations were shown to L.E. Per L.E. updated elevation<br />
drawings not required for the HRC.<br />
1.6 50% DD update (09.10.12) – the set will be reviewed by stakeholders with comments<br />
distributed to the design team approximately 2 weeks later. At the end of DD a full page-turn<br />
review will occur.<br />
1.7 Review schedule and priorities for upcoming meetings – 8/28, 9/19, 10/3: no priorities were<br />
identified for upcoming stakeholder meetings. The agendas are TBD. 9/26 was scheduled for<br />
an MEP “deep dive” with Larrie and Sid at opsis.<br />
1.8 Diversified’s scope/contract needs to be clarified based on OSU’s bidding requirements.<br />
James to coordinate with Diversified and L.E. will speak with Rick Brand.<br />
1.9 Opsis shared an ETO incentives email and will pull together fees for this scope of work,<br />
should OSU choose to pursue it.<br />
Sustainability Workshop<br />
1.10 A Sustainability Workshop Report will be compiled and issued separately to document the<br />
presentation, workgroups, feedback, and outcomes of the event.<br />
opsis architecture LLP