03.07.2013 Views

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

26<br />

Comparison of FSAR and BWR-LACP calcul<strong>at</strong>ions of drywell temper<strong>at</strong>ure<br />

was performed for the "Loss of All AC Power" results shown on Fig.<br />

Q.14.2-1 of the BFNP FSAR. Plant conditions assumed by the FSAR calcula<br />

tions include:<br />

1. Initial power = 100%.<br />

2. Loss of all AC power <strong>at</strong> time = 0.<br />

3. Drywell perfectly insul<strong>at</strong>ed on outside.<br />

4. He<strong>at</strong> capacity of interior equipment and structures is negligible.<br />

5. Energy input from primary surfaces is initially 2000 kW.<br />

6. He<strong>at</strong> transfer coefficient between <strong>at</strong>mosphere and wall is 11.36<br />

w/m**2°C (2 Btu/h ft2 °F) without steam condens<strong>at</strong>ion.<br />

7. Drywell coolers lost <strong>at</strong> time = 0 and not restarted.<br />

8. Steam leak = 0<br />

The conditions assumed for this analysis are of the same order as those<br />

assumed for the "Normal Recovery" part of the <strong>St<strong>at</strong>ion</strong> Blackout as dis<br />

cussed in this report. Comparisons of various predictions of drywell<br />

<strong>at</strong>mosphere temper<strong>at</strong>ure to the FSAR result are shown on Fig. 4.4. The drywell<br />

temper<strong>at</strong>ure climbs rapidly during the first 5 to 10 min, before he<strong>at</strong><br />

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!