03.07.2013 Views

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

Station blackout at Browns Ferry Unit One - Oak Ridge National ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

32<br />

Room. Also, Using a portable self-powered potentiometer, st<strong>at</strong>ion person<br />

nel can monitor local pressure suppression chamber and drywell tempera<br />

tures which are sensed by installed thermocouple elements.<br />

Following the restor<strong>at</strong>ion of normal AC power, either by recovery of<br />

the offsite power sources or by the delayed but finally successful loading<br />

of the onsite diesel-gener<strong>at</strong>ors, the Instrument<strong>at</strong>ion and Control buses<br />

would be re-energized, restoring all normal Control Room instrument<strong>at</strong>ion<br />

for use in monitoring the normal recovery.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!