05 List of DBO Projects in Last 10 Years - City Council
05 List of DBO Projects in Last 10 Years - City Council
05 List of DBO Projects in Last 10 Years - City Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Project Construction<br />
<strong>Years</strong> <strong>of</strong> <strong>DBO</strong><br />
Count Name <strong>of</strong> Facility State Project Type Facility Type Firms Involved Operator Completion Date Plant Size Contractor Operation Length <strong>of</strong> Operations Contract<br />
11 Pawtucket WTP RI <strong>DBO</strong> Water Eisenhardt Group, AECOM AECOM 2008 25 mgd 4 20 year contract operations term<br />
12 Plymouth WWTP MA <strong>DBO</strong> Wastewater 3 mgd 20 year contract operations term<br />
13 Woonsocket WWTP RI <strong>DBO</strong> Wastewater CH2M Hill CH2M Hill Anticipated for 2016 16 mgd 0 20 year contract operations term<br />
14<br />
15<br />
Pima County, Roger Road<br />
Water Reclamation Campus<br />
<strong>City</strong> <strong>of</strong> Phoenix, Lake<br />
Pleasant WTP<br />
AZ <strong>DBO</strong> Water CH2M-Hill CH2M-Hill anticipated for 2014 32 mgd N/A 20 year contract operations term<br />
AZ <strong>DBO</strong> Water<br />
16 Stockton WWTP CA <strong>DBO</strong> Wastewater<br />
17<br />
Fulton County, Camp Creek<br />
WWTP<br />
Black & Veatch, American<br />
Water<br />
CH2M Hill OMI and Thames<br />
Water<br />
GA <strong>DBO</strong> Wastewater Azurix (American Water)<br />
American<br />
Water<br />
CH2M Hill<br />
OMI and<br />
Thames<br />
Water<br />
Azurix<br />
(American<br />
Water)<br />
2007 80 mgd 5 15 year operation contract<br />
N/A 43 mgd N/A<br />
This was to be a 25 year contract operations term. This was a<br />
successful <strong>DBO</strong> project, but litigation arose relat<strong>in</strong>g to CEQA<br />
compliance issues with the process followed by the <strong>City</strong> to<br />
procure the contract, not the <strong>DBO</strong> structure, that resulted <strong>in</strong> the<br />
project be<strong>in</strong>g halted.<br />
20<strong>05</strong> 24 mgd 7 20 year contract operations term<br />
18 <strong>City</strong> <strong>of</strong> Hialeah RO WTP FL <strong>DBO</strong> Water AECOM/Inima Inima Anticipated for 2012 <strong>10</strong> mgd N/A 20 year contract operations term<br />
19 Lynn WWTP MA <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />
20<br />
Spokane County Regional<br />
WWTP<br />
U.S. Filter<br />
(Veolia)<br />
2004 25 mgd 8 20 year contract operations term<br />
WA <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill 2011 8 mgd 1 25 year contract operations term<br />
21 Spr<strong>in</strong>gfield WWTP MA <strong>DBO</strong> Wastewater<br />
U.S. Water, Northwest<br />
Water, United Utilities,<br />
Bechtel Enterprises<br />
U.S. Water 2002 43 mgd <strong>10</strong> 20 year contract operations term<br />
22 <strong>City</strong> <strong>of</strong> Wilsonville WWTP OR <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill Anticipated for 2014 4 mgd 1 20 year contract operations term<br />
23 <strong>City</strong> <strong>of</strong> Holyoke WWTP MA <strong>DBO</strong> Wastewater Aquarion, Kelda Group PLC Aquarion 2009 37 mgd 3 25 year contract operations term<br />
24 <strong>City</strong> <strong>of</strong> Newport WWTP RI <strong>DBO</strong> Wastewater Earth Tech (Tyco)<br />
Earth Tech<br />
(Tyco)<br />
2002 <strong>10</strong> mgd <strong>10</strong> 20 year contract operations term<br />
25 Naugatuck WWTP CT <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />
U.S. Filter<br />
(Veolia)<br />
2004 <strong>10</strong> mgd 8 20 year contract operations term<br />
26<br />
Beverly Hills Groundwater<br />
Desalter<br />
CA DBFO Water Earth Tech (AECOM)<br />
Earth Tech<br />
(AECOM)<br />
2003 3 mgd 9 20 year contract operations term<br />
27 Santa Paula WWTP CA DBFO Wastewater<br />
PERC Water, Al<strong>in</strong>da Capital<br />
Partners<br />
PERC<br />
Water<br />
20<strong>10</strong> 4.2 mgd 2 30 year concession term<br />
28<br />
San Juan Capistrano<br />
Groundwater Desalter<br />
CA <strong>DBO</strong> Water<br />
29 Haworth WTP NJ <strong>DBO</strong> Water<br />
Eco Resources (Southwest<br />
Water)<br />
United Water New Jersey,<br />
CDM<br />
Eco<br />
Resources<br />
(Southwest<br />
Water)<br />
2004 5 mgd 0<br />
CDM 2007 188 mgd 5<br />
This was to be a 20 year contract operations term. There were<br />
operational issues follow<strong>in</strong>g the passage <strong>of</strong> successful<br />
acceptance test<strong>in</strong>g. The resolution between the owner and the<br />
operator was that the owner would assume operations <strong>of</strong> the<br />
plant, which was work<strong>in</strong>g properly when the owner took over<br />
operations responsibility.<br />
2 September 20, 2012