06.07.2013 Views

05 List of DBO Projects in Last 10 Years - City Council

05 List of DBO Projects in Last 10 Years - City Council

05 List of DBO Projects in Last 10 Years - City Council

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project Construction<br />

<strong>Years</strong> <strong>of</strong> <strong>DBO</strong><br />

Count Name <strong>of</strong> Facility State Project Type Facility Type Firms Involved Operator Completion Date Plant Size Contractor Operation Length <strong>of</strong> Operations Contract<br />

11 Pawtucket WTP RI <strong>DBO</strong> Water Eisenhardt Group, AECOM AECOM 2008 25 mgd 4 20 year contract operations term<br />

12 Plymouth WWTP MA <strong>DBO</strong> Wastewater 3 mgd 20 year contract operations term<br />

13 Woonsocket WWTP RI <strong>DBO</strong> Wastewater CH2M Hill CH2M Hill Anticipated for 2016 16 mgd 0 20 year contract operations term<br />

14<br />

15<br />

Pima County, Roger Road<br />

Water Reclamation Campus<br />

<strong>City</strong> <strong>of</strong> Phoenix, Lake<br />

Pleasant WTP<br />

AZ <strong>DBO</strong> Water CH2M-Hill CH2M-Hill anticipated for 2014 32 mgd N/A 20 year contract operations term<br />

AZ <strong>DBO</strong> Water<br />

16 Stockton WWTP CA <strong>DBO</strong> Wastewater<br />

17<br />

Fulton County, Camp Creek<br />

WWTP<br />

Black & Veatch, American<br />

Water<br />

CH2M Hill OMI and Thames<br />

Water<br />

GA <strong>DBO</strong> Wastewater Azurix (American Water)<br />

American<br />

Water<br />

CH2M Hill<br />

OMI and<br />

Thames<br />

Water<br />

Azurix<br />

(American<br />

Water)<br />

2007 80 mgd 5 15 year operation contract<br />

N/A 43 mgd N/A<br />

This was to be a 25 year contract operations term. This was a<br />

successful <strong>DBO</strong> project, but litigation arose relat<strong>in</strong>g to CEQA<br />

compliance issues with the process followed by the <strong>City</strong> to<br />

procure the contract, not the <strong>DBO</strong> structure, that resulted <strong>in</strong> the<br />

project be<strong>in</strong>g halted.<br />

20<strong>05</strong> 24 mgd 7 20 year contract operations term<br />

18 <strong>City</strong> <strong>of</strong> Hialeah RO WTP FL <strong>DBO</strong> Water AECOM/Inima Inima Anticipated for 2012 <strong>10</strong> mgd N/A 20 year contract operations term<br />

19 Lynn WWTP MA <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />

20<br />

Spokane County Regional<br />

WWTP<br />

U.S. Filter<br />

(Veolia)<br />

2004 25 mgd 8 20 year contract operations term<br />

WA <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill 2011 8 mgd 1 25 year contract operations term<br />

21 Spr<strong>in</strong>gfield WWTP MA <strong>DBO</strong> Wastewater<br />

U.S. Water, Northwest<br />

Water, United Utilities,<br />

Bechtel Enterprises<br />

U.S. Water 2002 43 mgd <strong>10</strong> 20 year contract operations term<br />

22 <strong>City</strong> <strong>of</strong> Wilsonville WWTP OR <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill Anticipated for 2014 4 mgd 1 20 year contract operations term<br />

23 <strong>City</strong> <strong>of</strong> Holyoke WWTP MA <strong>DBO</strong> Wastewater Aquarion, Kelda Group PLC Aquarion 2009 37 mgd 3 25 year contract operations term<br />

24 <strong>City</strong> <strong>of</strong> Newport WWTP RI <strong>DBO</strong> Wastewater Earth Tech (Tyco)<br />

Earth Tech<br />

(Tyco)<br />

2002 <strong>10</strong> mgd <strong>10</strong> 20 year contract operations term<br />

25 Naugatuck WWTP CT <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />

U.S. Filter<br />

(Veolia)<br />

2004 <strong>10</strong> mgd 8 20 year contract operations term<br />

26<br />

Beverly Hills Groundwater<br />

Desalter<br />

CA DBFO Water Earth Tech (AECOM)<br />

Earth Tech<br />

(AECOM)<br />

2003 3 mgd 9 20 year contract operations term<br />

27 Santa Paula WWTP CA DBFO Wastewater<br />

PERC Water, Al<strong>in</strong>da Capital<br />

Partners<br />

PERC<br />

Water<br />

20<strong>10</strong> 4.2 mgd 2 30 year concession term<br />

28<br />

San Juan Capistrano<br />

Groundwater Desalter<br />

CA <strong>DBO</strong> Water<br />

29 Haworth WTP NJ <strong>DBO</strong> Water<br />

Eco Resources (Southwest<br />

Water)<br />

United Water New Jersey,<br />

CDM<br />

Eco<br />

Resources<br />

(Southwest<br />

Water)<br />

2004 5 mgd 0<br />

CDM 2007 188 mgd 5<br />

This was to be a 20 year contract operations term. There were<br />

operational issues follow<strong>in</strong>g the passage <strong>of</strong> successful<br />

acceptance test<strong>in</strong>g. The resolution between the owner and the<br />

operator was that the owner would assume operations <strong>of</strong> the<br />

plant, which was work<strong>in</strong>g properly when the owner took over<br />

operations responsibility.<br />

2 September 20, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!