05 List of DBO Projects in Last 10 Years - City Council
05 List of DBO Projects in Last 10 Years - City Council
05 List of DBO Projects in Last 10 Years - City Council
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Count Name <strong>of</strong> Facility State Project Type Facility Type Firms Involved Operator<br />
1<br />
2<br />
3<br />
4<br />
5<br />
6<br />
7<br />
Northeast Bakersfield Water<br />
Treatment Plants (WTPs)<br />
Seattle Public Utilities,<br />
Cedar Water Treatment<br />
Facility (WTF)<br />
Tampa Bay Water Authority,<br />
Tampa Bay Surface WTF<br />
<strong>City</strong> <strong>of</strong> Wilsonville,<br />
Willamette River WTP<br />
Camp Pendleton Southern<br />
Region Tertiary Treatment<br />
Plant<br />
San Diego County Water<br />
Authority's Tw<strong>in</strong> Oaks<br />
Calley WTP<br />
<strong>City</strong> <strong>of</strong> Clovis, Sewage<br />
Treatment/Water Reuse<br />
Facility<br />
CA<br />
<strong>DBO</strong> (Cal Water<br />
owner)<br />
Water<br />
WA <strong>DBO</strong> Water<br />
FL <strong>DBO</strong> Water<br />
OR<br />
<strong>DBO</strong> (operator<br />
hired under<br />
separate<br />
contract dur<strong>in</strong>g<br />
DB process)<br />
Water<br />
CA <strong>DBO</strong> Wastewater<br />
Cal Water DB manager<br />
w/Yarne & Assoc., B&V,<br />
Dill<strong>in</strong>gham, KJ, Lyles<br />
Construction, Bookman-<br />
Edmonston, M<strong>in</strong>gus<br />
Construction<br />
CH2M-Hill <strong>DBO</strong> manager<br />
w/MA Mortenson<br />
Construction Co.<br />
Veolia (operator and <strong>DBO</strong><br />
manager w/ Clark<br />
Construction), CDM (design),<br />
Brasfield & Gorrie<br />
MWH (DB); Veolia (operator);<br />
Slayden Construction (WTP<br />
construction; Natt McDougall<br />
Company (<strong>in</strong>take/pipel<strong>in</strong>e<br />
contraction); Tigard Electric<br />
CDM Constructors Inc. was<br />
the design-builder and is<br />
currently provid<strong>in</strong>g operation<br />
and ma<strong>in</strong>tenance. United<br />
Water is a subcontractor to<br />
CDM provid<strong>in</strong>g O&M labor.<br />
Project Construction<br />
Completion Date Plant Size<br />
Cal Water 2003 20 mgd 9<br />
CH2M-Hill 2004 180 mgd 8<br />
Veolia 2003<br />
72 mgd<br />
(recent<br />
expansion<br />
to 120 mgd)<br />
Veolia 2002 70 mgd <strong>10</strong><br />
United<br />
Water<br />
2006 5 mgd 6<br />
<strong>Years</strong> <strong>of</strong> <strong>DBO</strong><br />
Contractor Operation Length <strong>of</strong> Operations Contract<br />
18 year contract operations term with two 5 year extensions<br />
(other source says 25 year contract term)<br />
9 15 year contract operations term with 5 year extension<br />
CA <strong>DBO</strong> Water CH2M-Hill CH2M-Hill 2008 <strong>10</strong>0 mgd 4 15-year operations contract with 5 year extension<br />
CA <strong>DBO</strong><br />
Wastewater and<br />
Recycled Water<br />
8 Bessemer WTP AL <strong>DBO</strong> Water Ogden Water Systems<br />
9<br />
<strong>10</strong><br />
<strong>City</strong> <strong>of</strong> Filmore, Filmore<br />
WWTP<br />
Forsyth County, Fowler<br />
Water Reclamation Facility,<br />
WWTP<br />
CA <strong>DBO</strong> Wastewater American Water<br />
<strong>List</strong> <strong>of</strong> WTP and WWTP <strong>DBO</strong> <strong>Projects</strong> With<strong>in</strong> the <strong>Last</strong> <strong>10</strong> <strong>Years</strong> (a)<br />
CH2M-Hill CH2M-Hill 2009 2.8 mgd 3<br />
Ogden<br />
Water<br />
Systems<br />
American<br />
Water<br />
Initial operations contract extends to 2018 at which po<strong>in</strong>t a 5year<br />
renewal option will be available<br />
24 mgd 20 year contract operations term<br />
2007 1.8 mgd 5 20 year contract operations term<br />
GA <strong>DBO</strong> Wastewater ESG Operations Inc. 2004 2.5 mgd 8 20 year contract operations term<br />
1 September 20, 2012
Project Construction<br />
<strong>Years</strong> <strong>of</strong> <strong>DBO</strong><br />
Count Name <strong>of</strong> Facility State Project Type Facility Type Firms Involved Operator Completion Date Plant Size Contractor Operation Length <strong>of</strong> Operations Contract<br />
11 Pawtucket WTP RI <strong>DBO</strong> Water Eisenhardt Group, AECOM AECOM 2008 25 mgd 4 20 year contract operations term<br />
12 Plymouth WWTP MA <strong>DBO</strong> Wastewater 3 mgd 20 year contract operations term<br />
13 Woonsocket WWTP RI <strong>DBO</strong> Wastewater CH2M Hill CH2M Hill Anticipated for 2016 16 mgd 0 20 year contract operations term<br />
14<br />
15<br />
Pima County, Roger Road<br />
Water Reclamation Campus<br />
<strong>City</strong> <strong>of</strong> Phoenix, Lake<br />
Pleasant WTP<br />
AZ <strong>DBO</strong> Water CH2M-Hill CH2M-Hill anticipated for 2014 32 mgd N/A 20 year contract operations term<br />
AZ <strong>DBO</strong> Water<br />
16 Stockton WWTP CA <strong>DBO</strong> Wastewater<br />
17<br />
Fulton County, Camp Creek<br />
WWTP<br />
Black & Veatch, American<br />
Water<br />
CH2M Hill OMI and Thames<br />
Water<br />
GA <strong>DBO</strong> Wastewater Azurix (American Water)<br />
American<br />
Water<br />
CH2M Hill<br />
OMI and<br />
Thames<br />
Water<br />
Azurix<br />
(American<br />
Water)<br />
2007 80 mgd 5 15 year operation contract<br />
N/A 43 mgd N/A<br />
This was to be a 25 year contract operations term. This was a<br />
successful <strong>DBO</strong> project, but litigation arose relat<strong>in</strong>g to CEQA<br />
compliance issues with the process followed by the <strong>City</strong> to<br />
procure the contract, not the <strong>DBO</strong> structure, that resulted <strong>in</strong> the<br />
project be<strong>in</strong>g halted.<br />
20<strong>05</strong> 24 mgd 7 20 year contract operations term<br />
18 <strong>City</strong> <strong>of</strong> Hialeah RO WTP FL <strong>DBO</strong> Water AECOM/Inima Inima Anticipated for 2012 <strong>10</strong> mgd N/A 20 year contract operations term<br />
19 Lynn WWTP MA <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />
20<br />
Spokane County Regional<br />
WWTP<br />
U.S. Filter<br />
(Veolia)<br />
2004 25 mgd 8 20 year contract operations term<br />
WA <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill 2011 8 mgd 1 25 year contract operations term<br />
21 Spr<strong>in</strong>gfield WWTP MA <strong>DBO</strong> Wastewater<br />
U.S. Water, Northwest<br />
Water, United Utilities,<br />
Bechtel Enterprises<br />
U.S. Water 2002 43 mgd <strong>10</strong> 20 year contract operations term<br />
22 <strong>City</strong> <strong>of</strong> Wilsonville WWTP OR <strong>DBO</strong> Wastewater CH2M-Hill CH2M-Hill Anticipated for 2014 4 mgd 1 20 year contract operations term<br />
23 <strong>City</strong> <strong>of</strong> Holyoke WWTP MA <strong>DBO</strong> Wastewater Aquarion, Kelda Group PLC Aquarion 2009 37 mgd 3 25 year contract operations term<br />
24 <strong>City</strong> <strong>of</strong> Newport WWTP RI <strong>DBO</strong> Wastewater Earth Tech (Tyco)<br />
Earth Tech<br />
(Tyco)<br />
2002 <strong>10</strong> mgd <strong>10</strong> 20 year contract operations term<br />
25 Naugatuck WWTP CT <strong>DBO</strong> Wastewater U.S. Filter (Veolia)<br />
U.S. Filter<br />
(Veolia)<br />
2004 <strong>10</strong> mgd 8 20 year contract operations term<br />
26<br />
Beverly Hills Groundwater<br />
Desalter<br />
CA DBFO Water Earth Tech (AECOM)<br />
Earth Tech<br />
(AECOM)<br />
2003 3 mgd 9 20 year contract operations term<br />
27 Santa Paula WWTP CA DBFO Wastewater<br />
PERC Water, Al<strong>in</strong>da Capital<br />
Partners<br />
PERC<br />
Water<br />
20<strong>10</strong> 4.2 mgd 2 30 year concession term<br />
28<br />
San Juan Capistrano<br />
Groundwater Desalter<br />
CA <strong>DBO</strong> Water<br />
29 Haworth WTP NJ <strong>DBO</strong> Water<br />
Eco Resources (Southwest<br />
Water)<br />
United Water New Jersey,<br />
CDM<br />
Eco<br />
Resources<br />
(Southwest<br />
Water)<br />
2004 5 mgd 0<br />
CDM 2007 188 mgd 5<br />
This was to be a 20 year contract operations term. There were<br />
operational issues follow<strong>in</strong>g the passage <strong>of</strong> successful<br />
acceptance test<strong>in</strong>g. The resolution between the owner and the<br />
operator was that the owner would assume operations <strong>of</strong> the<br />
plant, which was work<strong>in</strong>g properly when the owner took over<br />
operations responsibility.<br />
2 September 20, 2012
Count Name <strong>of</strong> Facility State Project Type Facility Type Firms Involved Operator<br />
Project Construction<br />
Completion Date Plant Size<br />
30 Columbia WTP ID <strong>DBO</strong> Water United Water Idaho, CDM CDM 20<strong>05</strong> 6 mgd 7<br />
31<br />
Rockland County, Western<br />
Ramapo Advanced WWTP<br />
<strong>Years</strong> <strong>of</strong> <strong>DBO</strong><br />
Contractor Operation Length <strong>of</strong> Operations Contract<br />
NY <strong>DBO</strong> Wastewater Veolia Water Veolia 2012 1.5mgd 0 5 year contract operations term<br />
(a) The above list <strong>of</strong> projects was compiled from the knowledge-base <strong>of</strong> Jerry Gilbert, West Yost Associates, and Hawk<strong>in</strong>s Delafield Wood LLC and is, therefore, not exhaustive.<br />
3 September 20, 2012