VRIOGS 001 Revision B 15<br />

SECTION 7.0 Structure <strong>Gauge</strong> <strong>Envelopes</strong> for the PTV or Accredited Rail<br />

Operator – for new, or altered Infrastructure adjacent to, or in<br />

the Air Space over Track<br />

This section applies to any new, or alterations to existing Infrastructure constructed or installed by or<br />

on behalf of the PTV or accredited Infrastructure managers. These requirements are applicable only to<br />

tangent track. For curved track adjustments, refer to Section 4.2. Notes applicable to Figure 2:<br />

ENVELOPE F<br />

Envelope F applies to the placement of bridges, retaining walls (excluding platforms), bridge<br />

piers and structures adjacent to and/or in the airspace above the track.<br />

V4<br />

V5<br />

H4<br />

H5<br />

H6<br />

ENVELOPE G<br />

The minimum Vertical Clearance shall be 7.1m for new bridges and/or structures<br />

above track that has been identified to be used for interstate freight and/or for double<br />

stacked containers operations.<br />

Note for a grain gantry over a siding the Vertical Clearance can be reduced to 5.26m<br />

subject to approval of PTV.<br />

For track that is or is to be utilised for passenger and/or freight services and has no<br />

interstate freight or double stacked containers operation requirements, the Vertical<br />

Clearance may be reduced to a minimum of 5.75m subject to approval being<br />

granted to alter the height of existing overhead traction power wiring if required.<br />

The minimum Horizontal Clearance shall be 6.0m for bridge piers, bridge abutments<br />

and retaining walls (excluding platforms), where track access is required for road<br />

vehicles parallel to track.<br />

The minimum Horizontal Clearance shall be 4.0m for bridge piers, bridge abutments<br />

and retaining walls (excluding platforms), where track access is not required for road<br />

vehicles parallel to track, subject to the approval of PTV.<br />

The minimum Horizontal Clearance shall be 3.0m for bridge piers, bridge abutments<br />

and retaining walls (excluding platforms), where track access is not required for road<br />

vehicles parallel to track and where the track uses concrete sleepers or slab track,<br />

subject to the approval of PTV.<br />

Envelope G applies to the placement of verandah eaves adjacent to the track.<br />

V7<br />

V8<br />

H9<br />

H10<br />

There shall be a minimum Vertical Clearance of 7.1m for verandah eaves above<br />

track that has been identified to be used for interstate freight and/or for double<br />

stacked containers operations.<br />

For track that is utilised for passenger and/or freight services and has no future<br />

interstate freight and/or double stacked containers operation requirements, the<br />

Vertical Clearance may be reduced to a minimum of 5.26m for verandah eaves.<br />

There shall be a minimum Horizontal Clearance of 3m for verandah eaves where the<br />

track has been identified to be used for freight operations. Note in certain<br />

circumstances a reduced clearance of no less than 2.5m may be accepted subject<br />

to approval of PTV and the ARO.<br />

For track that is utilised for passenger services only and has no future freight<br />

requirements the minimum Horizontal Clearance may be reduced to 2.4m for<br />

verandah eaves.<br />

NOTE: This document is controlled only when viewed on the VRIOG Engineering Standards website. Any other<br />

copy of this document is uncontrolled, and the content may be inaccurate.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!