Structural Gauge Envelopes - Public Transport Victoria
Structural Gauge Envelopes - Public Transport Victoria
Structural Gauge Envelopes - Public Transport Victoria
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
VRIOGS 001 Revision B 23<br />
SECTION 10.0 Structure <strong>Gauge</strong> <strong>Envelopes</strong> – for new or existing<br />
Infrastructure adjacent to, or in the Air Space over Tram<br />
tracks and Tramstop Platforms<br />
The Structure <strong>Gauge</strong> Envelope for new or existing Infrastructure adjacent to, or in the Air Space over<br />
tram tracks and tram stop platforms is outlined in standard drawings STD_T9000 Revision A and<br />
STD_T0306 Revision B. The referenced standard drawings can be accessed through the <strong>Public</strong><br />
<strong>Transport</strong> <strong>Victoria</strong> Drawing Management System at:<br />
https://dms.ptv.vic.gov.au/<br />
The clearances outlined in the referenced drawings are for straight track only and an additional lateral<br />
distance, varying up to 600mm, is required on curves. A table for the additional clearances required for<br />
curved track is located on standard drawing STD_T0306 Revision B. If this is not used then the<br />
additional distance needs to be calculated and approved by the ARO.<br />
NOTE: This document is controlled only when viewed on the VRIOG Engineering Standards website. Any other<br />
copy of this document is uncontrolled, and the content may be inaccurate.