18.07.2013 Views

Final Conservation Plan - Kildare.ie

Final Conservation Plan - Kildare.ie

Final Conservation Plan - Kildare.ie

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

overlooking v<strong>ie</strong>wing platform is completed and its fabric condition monitored over a period of one<br />

year.<br />

The ordering given in terms of priority of actions may need to be rev<strong>ie</strong>wed as some of the actions<br />

are dependent on volunteer work or on a timescale related to weather, (i,e. use of lime) or growing<br />

season.<br />

6.5 Rev<strong>ie</strong>w<br />

A periodic rev<strong>ie</strong>w needs to be carr<strong>ie</strong>d out of the <strong>Conservation</strong> <strong>Plan</strong>.<br />

The structural stability of the Toll collector‟s house is probably the first order of priority. The timing of<br />

the rest of the works may be curtailed by the new economic climate and this will need to be<br />

rev<strong>ie</strong>wed annually. The raising of the awareness of the significance of the site through a seminar or<br />

launch day could be in tandem with the entrance area though should if possible incorporate the<br />

refurbishment of the Bath and v<strong>ie</strong>wing platform.<br />

34 | P a g e

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!