21.07.2013 Views

Sunday

Sunday

Sunday

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

SB13<br />

4 - Lower-bound Analyses of the Lift-and-Project Ranks of<br />

Graph-based Polytopes<br />

Yu Hin Au, PhD Candidate, University of Waterloo, 200 University<br />

Ave., W., Waterloo, ON, N2L3G1, Canada, yau@uwaterloo.ca<br />

We’ll discuss some ongoing work on obtaining inapproximability results for<br />

Bienstock-Zuckerberg and Lasserre lift-and-project algorithms on graph-based<br />

optimization problems. This is joint work with Levent Tuncel.<br />

■ SB13<br />

13- West 106 B- CC<br />

Computational Issues on Solving Mixed Integer<br />

Second Order Cone Optimization Problems<br />

Sponsor: Optimization/Linear Programming and Complementarity<br />

Sponsored Session<br />

Chair: Julio Cesar Goez, PhD Candidate, Lehigh University, 18015,<br />

United States of America, jgoez1@gmail.com<br />

1 - Computational Effectiveness of Split Cuts for Second-order<br />

Conic Programming<br />

Sina Modaresi, University of Pittsburgh, 3700 O’Hara Street,<br />

Pittsburgh, United States of America, sim23@pitt.edu,<br />

Mustafa Kilinc, Juan Pablo Vielma<br />

Split cuts are one of the most effective cuts for linear MIPs and they are<br />

equivalent to MIR cuts. We show that this equivalency does not hold for secondorder<br />

conic MIPs by giving examples where split cuts strictly dominate conic MIR<br />

cuts proposed by Atamturk et al.. However, split cuts have to be added as<br />

nonlinear inequalities, while conic MIR cuts can be added as linear inequalities to<br />

the extended formulation. We compare the trade-off between the speed and the<br />

strength of these cuts.<br />

2 - Branch and Bound for Mixed Integer Second Order Cone<br />

Optimization: Impact of Disjunctive Conic Cuts<br />

Julio Cesar Goez, PhD. Candidate, Lehigh University, 18015,<br />

United States of America, jgoez1@gmail.com, Pietro Belotti,<br />

Ted Ralphs, Tamás Terlaky, Imre Polik<br />

We investigate the use of Disjunctive Conic Cuts (DCC) in a Branch and Cut<br />

framework when solving MISOCO problems. Various criteria are explored to<br />

select the disjunctions to build DCCs at different nodes of the tree. Additionally,<br />

we explore different criteria for node selection and branching rules. These<br />

experiments will help us to understand the impact that DCCs have in decreasing<br />

the size of the search tree and the solution time.<br />

3 - Restrict-and-Relax Search for 0-1 Integer Programs<br />

Menal Guzelsoy, SAS, 100 SAS Campus Drive, Cary, NC, 7513,<br />

United States of America, menal.guzelsoy@sas.com,<br />

George Nemhauser, Martin Savelsbergh<br />

We introduce restrict-and-relax search, an algorithm for 0-1 integer programs<br />

that explores a dynamic search tree by not only fixing variables (restricting), but<br />

by also unfixing previously fixed variables (relaxing). Starting by solving a<br />

restricted integer program, we may at any tree node selectively relax/restrict<br />

variables using dual/structural information. A proof-of-concept computational<br />

study demonstrates the effectiveness of the algorithm.<br />

4 - A Regularized Interior-Point Method for<br />

Semidefinite Programming<br />

Ahad Dehghani, McGill University, Montreal, Canada,<br />

ahad.dehghani@mcgill.ca, Jean-Louis Goffin, Dominique Orban<br />

Interior-point methods in semi-definite programming (SDP) require the solution<br />

of a sequence of linear systems which are used to derive the search directions.<br />

Safeguards are typically required in order to handle rank-deficient Jacobians and<br />

free variables. We propose a primal-dual regularization to the original SDP and<br />

show that it is possible to recover an optimal solution of the original SDP via<br />

inaccurate solves of a sequence of regularized SDPs for both the NT and dual<br />

HKM directions.<br />

INFORMS Phoenix – 2012<br />

84<br />

■ SB14<br />

14- West 106 C- CC<br />

Uncertainty in Project Management<br />

Contributed Session<br />

Chair: Bajis Dodin, Professor, University of California, School of<br />

Business Administration, Riverside, CA, 92521, United States of<br />

America, bajis.dodin@ucr.edu<br />

1 - Enumerating Feasible Task Sets with Ordered, Unmeasured<br />

Material Constraints<br />

Jordan Srour, Assistant Professor, Lebanese American University,<br />

P.O. Box 13-5053, Beirut, Lebanon, fjsrour@gmail.com,<br />

Walid Nasrallah<br />

We investigate the solution space for selecting a subset of project tasks under a<br />

resource shortage. The amount of resource required by each task is not known,<br />

but the tasks are fully ordered accordingly. We enumerate the ways to select a<br />

subset of tasks without exceeding the resource constraint. We highlight the<br />

relationship of this enumeration to published number sequences arising from<br />

regular Boolean functions. We provide both an enumeration algorithm and<br />

enumerations up to n=10.<br />

2 - Stochastic Approach for Project Scheduling Based on<br />

Fund Availability<br />

Yuvraj Gajpal, Assistant Professor, King Fahd University of<br />

Petroleum and Minerals, KFUPM Box 634, Dhahran,<br />

Saudi Arabia, gajpaly@gmail.com, Ashraf Elazouni<br />

The paper considers a finance based project where the contractors finance projects<br />

mainly through the owners’ progress payments supplemented by fund procured<br />

through establishing credit-line accounts. In this situation the best proactive<br />

approach for contractor is to schedule construction activities based on the<br />

available finance. A stochastic heuristic approach is proposed to device financebased<br />

schedules of multiple projects.<br />

3 - A Nonlinear Programming Model for Stochastic Project<br />

Crashing<br />

Ronald Davis, Associate Professor, San Jose State University,<br />

College of Business, One Washington Square, San Jose, CA,<br />

95192, United States of America, ronald.davis@sjsu.edu<br />

When beta distributions are used for every activity early start and finish time<br />

distribution in a project network, moment preserving beta approximations for the<br />

sum and product of beta cdfs can be coded in VBA to allow an analytic stochastic<br />

forward pass to be carried out, without simulation. Introduction of crashing<br />

variables and costs yields a nonlinear programming formulation to minimize<br />

crash cost subject to a constraint on mean project duration. Realistic example<br />

SOLVER results are shown.<br />

4 - Portfolio Management in a Highly Uncertain Environment: The<br />

Role of Interdependencies<br />

Olga Kokshagina, PhD Student, Centre for Scientific Management<br />

(CGS), CGS Mines ParisTech, 60 Boulevard Saint-Michel, Paris,<br />

75272, France, olga.kokshagina@mines-paristech.fr, Patrick Cogez,<br />

Pascal Le Masson, Benoit Weil<br />

This work deals with portfolio management strategies in high uncertainty. There<br />

exist strategies that consider projects separately or dependently. Literature shows<br />

first, the dependencies have a tendency to increase complexity and cost of the<br />

system. Second, there is a possibility to share risks in between projects, to<br />

highlight the effect of learning. Our paper investigates the contradictory role of<br />

interdependencies and the relevant management strategies in particular industrial<br />

situations.<br />

5 - Scheduling & Financial Planning in Probabilistic Projects<br />

Bajis Dodin, Professor, University of California, School of Business<br />

Administration, Riverside, CA, 92521, United States of America,<br />

bajis.dodin@ucr.edu, Abdelghani Elimam<br />

In probabilistic projects (PP) required duration and resources for some or all<br />

activities are given as random variables characterized by their own probability<br />

distribution functions (PDFs). Managing a PP requires dealing with several<br />

important issues. In this paper, we analyze the impact of the various stochastic<br />

variations on the duration, and cost of the project. Procedures for determining the<br />

PDFs of project cost and duration, and project schedule are developed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!