TNUIFSL<br />
<strong>City</strong> Corporate cum Business <strong>Plan</strong> for Dharapuram<br />
1.2.2.5 Suggestions of the Review Committee on the<br />
Interim Report<br />
The Review Committee during the aforesaid Interim meeting made some specific<br />
suggestions pertaining to Dharapuram <strong>Municipal</strong>ity to be addressed in the Draft Final<br />
Stage and the same is listed out below:<br />
1. The consultants were requested to prioritize the projects based on the demand<br />
for the project & demand from the stake holders and also have to consider the<br />
state policy and the financial capacity of the local body<br />
2. The consultants had mentioned in the report that the OWG will be formed,<br />
which will work towards identifying the issues, developing the strategies and<br />
finalize the capital investment plans. But it was found that stakeholder<br />
consultation was treated as OWG. Hence the consultants were requested to<br />
form the OWG and continuously interact with them towards effective<br />
completion of the assignment<br />
3. It was mentioned that the most of the projects identified were proposed under<br />
UIDSSMT. The consultants were requested to consider allocation to the state<br />
and to the local body for all the schemes and were requested to work out the<br />
project financials accordingly<br />
4. In solid waste management sector the consultant has given provisions only for<br />
collection system and compost yard. However they were requested to make a<br />
provision for scientific sanitary landfill facility for all towns<br />
5. The consultant has proposed some of the remunerative projects in second and<br />
third phase. However if there is a demand for such remunerative projects, this<br />
may be implemented in the first phase as this may act as an additional source<br />
of income for the local bodies<br />
6. Wherever tourism potential is huge, the consultants can identify some of the<br />
tourism project which may also be implemented by tourism / other<br />
departments<br />
7. The consultant has to consider O&M for Underground sewerage system only<br />
after completion of the scheme<br />