<strong>City</strong> Corporate cum Business <strong>Plan</strong> for Dharapuram<br />

1.2.2.5 Suggestions of the Review Committee on the<br />

Interim Report<br />

The Review Committee during the aforesaid Interim meeting made some specific<br />

suggestions pertaining to Dharapuram <strong>Municipal</strong>ity to be addressed in the Draft Final<br />

Stage and the same is listed out below:<br />

1. The consultants were requested to prioritize the projects based on the demand<br />

for the project & demand from the stake holders and also have to consider the<br />

state policy and the financial capacity of the local body<br />

2. The consultants had mentioned in the report that the OWG will be formed,<br />

which will work towards identifying the issues, developing the strategies and<br />

finalize the capital investment plans. But it was found that stakeholder<br />

consultation was treated as OWG. Hence the consultants were requested to<br />

form the OWG and continuously interact with them towards effective<br />

completion of the assignment<br />

3. It was mentioned that the most of the projects identified were proposed under<br />

UIDSSMT. The consultants were requested to consider allocation to the state<br />

and to the local body for all the schemes and were requested to work out the<br />

project financials accordingly<br />

4. In solid waste management sector the consultant has given provisions only for<br />

collection system and compost yard. However they were requested to make a<br />

provision for scientific sanitary landfill facility for all towns<br />

5. The consultant has proposed some of the remunerative projects in second and<br />

third phase. However if there is a demand for such remunerative projects, this<br />

may be implemented in the first phase as this may act as an additional source<br />

of income for the local bodies<br />

6. Wherever tourism potential is huge, the consultants can identify some of the<br />

tourism project which may also be implemented by tourism / other<br />

departments<br />

7. The consultant has to consider O&M for Underground sewerage system only<br />

after completion of the scheme<br />

T<br />

N<br />

U<br />

D<br />

P<br />

I<br />

III<br />

Final<br />

Report<br />

1-9